Laserfiche WebLink
Stantec <br /> Quarterly Status Summary Report—First Quarter 2012 <br /> ARCO Service Station No. 2186 <br /> May 31, 2012 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC a BP Affiliated Company, for the express purpose <br /> - of this report for a different purpose or others not identified above <br /> above. An re use p Y <br /> stated abo p p <br /> Y <br /> shall be at the user's sole risk without liability to Stantec. To the extent that this report is based <br /> on information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prepared by: Reviewed by: <br /> imber Collins Catherine Francini <br /> Project Scientist Project Manager <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver: SSNoNAL Ge <br /> olo <br /> c BRIAN D. <br /> WESTHOFFT—+ <br /> Brian Westhoff, P.G. sNo.8784 <br /> Senior Geologist 9T X <br /> FOF CAO- <br /> May 31, 2012 <br /> cc: Mr. Sergio Morescalchi, ARC, a BP Affiliated Company (Upload to Enfos) <br /> Mr. James Barton, California Regional Water Quality Control Board, Central Valley Region <br /> Upload to Geotracker <br /> I <br /> i <br /> I <br /> 2186 QSSR 1012.doc 4 <br />