My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000813
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 11:03:46 AM
Creation date
2/15/2019 9:21:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000813
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date November 20,2002 <br /> Quarter 3rd Quarter,2002 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2186 <br /> Address 3212 North California Street, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URSNernon Elarth <br /> Consultant Project No 38465946 00436 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Services <br /> (SJCEHS) <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Third 2002): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2002): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Third 2002): <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-7, and VW-1A through VW-313- <br /> _sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater 48 6 to 50 2 feet below ground surface <br /> Groundwater Gradient Northeast @ 0 005 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • Elevated reporting limits were due to dilutions performed by the laboratory in order to quantitate a target <br /> analyte <br /> DISCUSSION: <br /> Wells VW-lA, VW-2A, and VW-3A were dry and thus could not be sampled Total petroleum hydrocarbons as <br /> gasoline (TPHg), benzene, toluene, ethylbenzene, total xylenes (BTEX), methyl tert-butyl ether (MtBE), tert-butyl <br /> alcohol (TBA), and 1,2-dichloroethane (1,2-DCA) were reported in several wells located in the vicinity of the <br /> underground storage tanks Chemical concentrations were consistent with historical data Groundwater elevations <br /> K V5 RF ARCM2 186\2186 GWMR3Q02 tk� Page 1 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.