My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:46:44 AM
Creation date
2/15/2019 9:25:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000817
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date January 24,2005 <br /> Quarter 4`s Quarter,2004 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2186 <br /> Address 3212 North California Street, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URSNernon Elarth <br /> Consultant Project No 38466462 0A152 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> (SJCEHD) _ _ <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Fourth 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling The following well locations were unable to be <br /> sampled or monitored due to insufficient water VW-lA,VW-2A,VW-3A,and VW-4 <br /> 2 Prepared and subnutted quarterly groundwater monitoring report <br /> 3 Performed operation and maintenance of S VE system <br /> WORK PROPOSED FOR NEXT QUARTER (First 2005): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Perform operation and maintenance of SVE system <br /> QUARTERLY RESULTS SUMMARY (Fourth 2004): <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling MW-1 through MW-8 and VW-1 A through VW-4 sampled <br /> Quarterly <br /> Frequency of Groundwater Quarterly <br /> Monitoring <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Bulk Soil Removed this Quarter <br /> Bulk Soil Removed to Date <br /> Current Remediation Techniques _ SV_E Treatment System <br /> GRO Removed This Quarter 30 4eounds (lbs) <br /> Cumulative GRO Removed to Date 124 1lbs <br /> Benzene Removed this Quarter 0 lbs <br /> Cumulative Benzene Removed to 0 lbs <br /> Date <br /> MtBE Removed this Quarter 0 48 lbs <br /> Cumulative MtBE Removed to Date 2 88 lbs <br /> Approximate Depth to Groundwater 47 68 to 50 00 feet below ground surface (b s) T <br /> Groundwater Flow and Gradient ^Southeast @ 0 03 feet/foot(ft/ft) <br /> K\Wproc WJ5 BP ARCON021861Quanerly12004W QTR 04\2186 GWW 4Q04 doc Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.