Laserfiche WebLink
I <br /> ` ff <br /> f <br /> j <br /> m( ALPINE STREET <br /> i <br /> r <br /> m <br /> n SIDEWALK DRIVEWAY <br /> r Existing <br /> w GJ sign <br /> 0M <br /> ,Z z <br /> B-9/MW-4 <br /> ©(64.1/<0"5/760*) <br /> S -B-3/VW=.1 a - - <br /> ar-------- 1, <br /> m N I i i B--1/MW-1 1 <br /> `--------- I (15,400/552/984•) <br /> s3 I r-----------I <br /> Q o i I <br /> m <br /> --------- Underground <br /> 7/VW-2 storage tanks <br /> 7 (80.4/[0:5/262*) <br /> I <br /> " - - a I ♦�B-z -�-- APPROXIMATE <br /> I B-5/MW-3 PROPERTY BOUNDARY <br /> 'I EXPLANATION <br /> B-6o- --ac @)B s%o s/s 66«)Q Monitoring well <br /> Dispenser V Vapor extraction well <br /> island (Typ.) f <br /> a -- -0 Angle soil boring <br /> (80.4/<0.5/262*) Concentration of total petroleum <br /> hydrocarbons as gasoline (TPHG), <br /> STATIONbenzene, and MTBE in groundwater <br /> BUILDING I (ug/L); samples collected 12/3/99 <br /> W < Not detected at or above the <br /> Y indicated laboratory detection limit <br /> Analyzed. by EPA Method 8260 <br /> I I <br /> ` ,�/`'1/� VENUE <br /> V/EI Y`, ARCO PRODUCTS COMPANY <br /> " SONOI V► A UE SERVICE STATION 2186 <br /> SCALE R CO~ <br /> 0 30 60 FEET <br /> FIGURE 2 <br /> GROUNDWATER ANALYTICAL SUMMARY <br /> .Source: Map modified from map provided <br /> FOURTH QUARTER 1999 <br /> by Morrow Surveying. 3212 NORTH CALIFORNIA STREET <br /> STOCKTON, CALIFORNIA <br /> SANJOSE/CARD: N:\cad\DWG\PINACL\2186\2185chem.dwg Man, 07/Feb/00 0-3:27pm kblack <br />