My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000819
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:52:59 AM
Creation date
2/15/2019 9:28:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000819
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date February 22, 2000 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No: 02186 Address: 3212 North California Street, Stockton, California <br /> ARCO Environmental Engineer: Paul Supple <br /> Consulting Co./Contact Person:--IT Cor oration/David-Foley <br /> Consultant Project No: 791699 <br /> Primary Agency/Regulatory 1D No: Carol Oz, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 1999): <br /> 1. Groundwater-samples were collected and submitted for laboratory analysis from monitoring wells <br /> MW-1 through MW-4 and vapor well VW-3. Analysis included oxygenates by USEPA Method 8260. <br /> 2. IT compiled and evaluated the groundwater monitoring data. <br /> 3. Submitted October 19, 1999 report entitled Additional Assessment of Hydrocarbon Impacted Soil and <br /> Groundwater. <br /> WORK PROPOSED FOR NEXT QUARTER (First 2000): <br /> 1. IT will continue'to perform quarterly groundwater monitoring. The next sampling event is tentatively <br /> scheduled for March 2000. Groundwater samples from wells MW-1 through MW-4 and vapor well VW- <br /> 3 will be collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG) using U.S. <br /> 0Y <br /> Environmental Protection Agency (USEPA) Method 8015 Modified;for benzene, toluene, <br /> ethylbenzene, and total xylenes (BTEX), and methyl tert-butyl ether (MTBE).using USEPA <br /> Method 8020; and for oxygenates tertiary butanol, MTBE, di-isopropyl ether, ethyl tertiary butyl ether, <br /> and tertiary amyl methyl ether using USEPA Method 8260. <br /> 2. Submit workplan for additional site assessment and feasibility testing. <br /> Current Phase of Project: Monitoring <br /> Frequency of Groundwater Sampling: MW-1 through MW-4, and VW-3 = Quarter) <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Sample Date: December 3, 1999 <br /> Is Free Product (FP) Present on Site: No <br /> FP Recovered this Quarter: NA <br /> Cumulative FP Recovered to Date: NA <br /> Approximate Depth to Groundwater: 37.84 to 39,33 <br /> Direction of Groundwater Flow: East <br /> Groundwater Gradient: 0.003 ft/ft <br /> CP:1N:1CamFk\DataVvchiveWco121861Qtrly\2186Q499.DOC-98%g:1 IT Corpora tion <br /> 02/22/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.