Laserfiche WebLink
division of **� <br /> l"80NMENTAL SOLUTIONS13 24 i <br /> emcon <br /> J i V <br /> November 6, 1998 <br /> Project 20805-147.005 <br /> Mr. Paul Supple <br /> ARCO Products Company <br /> P.O. Box 6549 <br /> Moraga, California 94570 <br /> Re: Quarterly Groundwater Monitoring Report, Second Quarter 1998, for ARCO Service <br /> Station No. 2186, Located at 3212 North California Street, Stockton, California <br /> Dear Mr. Supple: <br /> Pinnacle Environmental Solutions, a division of EMCON (Pinnacle), is submitting the attached <br /> report which presents the results of the second quarter 1998 groundwater monitoring and <br /> sampling program at ARCO Products Company (ARCO) Service Station No. 2186, located at <br /> 3212 North California Street, Stockton, California. The quarterly monitoring program is in <br /> compliance with the San Joaquin County Public Health Services (SJCPHS) requirements <br /> regarding underground storage tank investigations. <br /> LIMITATIONS <br /> No monitoring event is thorough enough to describe all geologic and hydrogeologic conditions <br /> of interest at a given site. If conditions have not been identified during the monitoring event, <br /> such a finding should not, therefore, be construed as a guarantee of the absence of such <br /> conditions at the site, but rather as the result of the scope, limitations, and cost of work <br /> performed during the monitoring event. <br /> Please call if you have questions. <br /> Sincerely, <br /> Pinnac e <br /> Joel Coffman ay . Jo son, R.G. 5867 <br /> Project Manager Se or P ject Supervisor <br /> Attachment: Quarterly Groundwater Monitoring Report, Second Quarter 1998 <br /> cc: /Steve Sasson, San JoaquinY Count Public Health Services <br /> Elizabeth Thayer, California Regional Water Quality Control Board <br /> 3939 Cambridge Road,Suife 220 Cameron Park,California 95682 (530)676-6884 (530)676-§W fM/98 <br />