My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000832
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:17:46 AM
Creation date
2/15/2019 9:37:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000832
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date November 2, 2001 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02186 Address 3212 North California Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-330-1 <br /> Primary AgencylRegulatory ID No Samuel Savig, San Joaquin County PHS/EHD <br /> WORK PERFORMED THIS QUARTER (Third 2001) <br /> 1 Delta collected monthly depth to water measurements in the monitoring wells and vapor extraction <br /> wells <br /> 2 Groundwater samples were collected from monitoring wells MW-1 through MW-7 and vapor <br /> extraction wells VW-1 B, VW-21B, and VW-36 on September 13, 2001 and submitted for laboratory <br /> analysis <br /> 3 Delta compiled and evaluated the groundwater monitoring data <br /> 4 Delta retained Woodward Drilling Company to drill and install 3 offsite monitoring wells on August <br /> 13 and 14, 2001 <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2001) <br /> 1 Depth-to-water measurements will be collected from the monitoring and vapor extraction wells on <br /> a monthly basis <br /> 2 Delta will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for December 2001 Groundwater samples from monitoring wells MW-1 <br /> through MW-7 and vapor extraction wells VW-1 B, VW-213 and VW-3B will be collected and <br /> analyzed for total petroleum hydrocarbons as gasoline (TPHG), benzene, toluene, ethylbenzene, <br /> and total xylenes (BTEX) using USEPA Method 8015/8020 DHS LOFT, and for tertiary butyl <br /> alcohol (TBA), methyl tertiary butyl ether, (MTBE), di-isopropyl ether (DIPE), ethyl tertiary butyl <br /> ether (ETBE), tertiary amyl methyl ether (TAME), and 1,2-dichloroethane (1,2-DCA) using USEPA <br /> Method 8260A <br /> 3 Delta will submit a well installation report documenting the findings of the August 13 and 14 <br /> subsurface assessment activities <br /> Current Phase of Project Monitoring_ <br /> Frequency of Groundwater Sampling MW-1 through MW-7 and shallow vapor wells VW-1 <br /> through VW-3= Quarterly <br /> Frequency of Groundwater Monitoring Monthly _ <br /> Sample Date September 13, 2001 <br /> Is Free Product(FP) Present on Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 45 10 to 46 69 feet bgs (September 13, 200 1) <br /> P\A.RCO121 WQTRLY12001\Arco_2186}Q01 Report doc Delta <br />
The URL can be used to link to this page
Your browser does not support the video tag.