My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000839
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:18:13 AM
Creation date
2/15/2019 9:43:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000839
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date June 6, 2000 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02186 Address 3212 North California Street, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person IT Corporation/David Foley <br /> Consultant Project No 803883 <br /> Primary Agency/Regulatory ID No Carol Oz, San Joaquin Coun Public Health Services <br /> WORK PERFORMED THIS QUARTER (First 2000) <br /> 1 Groundwater samples were collected and submitted for laboratory analysis from monitoring wells MW-1 <br /> through MW-4 and vapor well VW-3 Analysis included oxygenates by USEPA Method 8260 <br /> 2 IT compiled and evaluated the groundwater monitoring data <br /> 3 Submitted workplan for further assessment of groundwater impacts and feasibility testing <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2000) <br /> 1 Quarterly groundwater monitoring will continue on behalf of ARCO The next sampling event is <br /> tentatively scheduled for June 2000 Groundwater samples from wells MW-1 through MW-4 and vapor <br /> well VW-3 will be collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG) using <br /> U S Environmental Protection Agency (USEPA) Method 8015 Modified, for benzene, toluene, <br /> ethylbenzene, and total xylenes (BTEX), and methyl tert-butyl ether (MTBE) using USEPA <br /> Method 8020, and for oxygenates tertiary butanol, MTBE, di-isopropyl ether, ethyl tertiary butyl ether, <br /> and tertiary amyl methyl ether using USEPA Method 8260 <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-4, and VW-3 = Quarterly <br /> Frequency of Groundwater Monitoring Quarterly _. <br /> Sample Date Aril 3, 2000 <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 34 30 to 35 90 <br /> Direction of Groundwater Flow Northeast <br /> Groundwater Gradient 0 003 <br /> i <br /> CP W 1CamPk\Data\Archive\Arco121861Qtrly12186Q100 DOC-984t I IT Corporation <br /> 06/06/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.