My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000853
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
ARCHIVED REPORTS XR0000853
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:23:44 AM
Creation date
2/15/2019 9:45:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000853
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br /> Date May 17, 1996 <br /> i ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No: 20 186 Address: 3212 North California Street, Stockton, California <br /> ARCO Environmental Engineer: Kyle Christie <br /> Consulting Co./Contact Person: EIVICON/Jay R. Johnson <br /> Consultant Project No: 20805-147.002 <br /> Primary Agency/Regulatory ID No: Steve Sasson, San Joaquin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (First- 1996): <br /> 1. Performed quarterly groundwater sampling. <br /> 2. Compiled and evaluated groundwater monitoring data. <br /> 3. Finalized and submitted the Preliminary Investigation Evaluation Report (February 6, 1996) to the <br /> regulatory agency. <br /> WORKED PROPOSED FOR NEXT QUARTER (Second- 1996): <br /> 1. ARCO will continue to perform quarterly groundwater monitoring. The next sampling event is <br /> tentatively scheduled for May 1996. <br /> Current Phase of Project: Assessment <br /> Frequency of Groundwater Sampling: Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On Site: No <br /> FP Recovered this Quarter: None <br /> Cumulative FP Recovered to Date: None <br /> Approximate Depth to Groundwater: 49.99 to 51.16 <br /> Groundwater Gradient: East <br /> 0.003 <br /> DISCUSSION (optional): <br /> Results of this monitoring event indicated that levels of dissolved gasoline hydrocarbons are consistent <br /> with levels detected during previous sampling events. Groundwater gradient is consistent with previous <br /> sampling events. Groundwater elevation increased approximately 3.62 feet from the previous sampling <br /> event (December 1995). <br /> ATTACHMENTS: <br /> o Table 1 Groundwater Monitoring Data <br /> • Figure 1 Site Location Map <br /> • Figure 2 Generalized Site Plan <br /> • Figure 3 Groundwater Contour Map (February 16, 1996) <br /> • Appendix A Sampling and Analysis Procedures <br /> 0 Appendix B Laboratory Analysis Reports and Chain-of-Custody Records <br /> cc: Elizabeth Thayer, RWQCB <br /> SAC-,N:\P70N0805508051470.2BS-95\qb:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.