Laserfiche WebLink
1. li <br /> Mr. Kyle Christie Project 0805-147.02 <br /> • March 12, 1996 <br /> Page 3 <br /> ANTICIPATED WORK <br /> • ARCO will continue to perform quarterly groundwater monitoring. The next <br /> sampling event is tentatively scheduled for March 1996. <br /> • EMCON will finalize and submit the PIER. <br /> CONCLUSIONS <br /> The direction of groundwater flow during the December 1995 sampling event was toward the <br /> east, which is consistent with the previous sampling event. Dissolved gasoline hydrocarbons <br /> were detected in the groundwater sample collected from well MW-1. Dissolved gasoline <br /> hydrocarbons have decreased from the previous sampling event. <br /> DOCUMENT DISTRIBUTION <br /> We recommend that a copy of this report be forwarded to the following: <br /> Steve Sasson <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P. O. Box 388 <br /> Stockton, California 95201-0388 <br /> Elizabeth Thayer <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> I <br /> sA(.% \FJft80W8051470.2AS-95Ncjb:1 <br />