Laserfiche WebLink
THIS QUARTER ACTIVITIES (Fourth Quarter 2005) <br /> 1. Performed quarterly groundwater monitoring and sampling (TRC). <br /> 's <br /> 2. Prepared and submitted a quarterly status summary report. <br /> NEXT QUARTER ACTIVITIES (First Quarter 2006) <br /> 1. Perform quarterly groundwater monitoring and sampling (TRC). <br /> 2. Prepare and submit a quarterly status summary quarterly report. <br /> 3. Implement work plan for additional vertical delineation. <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Based on the fourth quarter groundwater monitoring and sampling and data benzene $ <br /> and MTBE are laterally delineated to low or non-detectable levels. TPPH is laterally xT <br /> delineated in all directions to below 100 ppb. SECOR will install deep and intermediate <br /> monitoring wells in accordance with the Work Plan for Additional Vertical Site , <br /> Assessment dated August 17, 2005. <br /> LIMITATIONS <br /> . This report has been <br /> A prepared for the exclusive use of CanocoPhillips and its <br /> representatives as it pertains to the property located at 16470 Cambridge Street in <br /> Lathrop, California. The evaluation of subsurface conditions at the site for the purpose <br /> of this investigation is inherently limited due to the number of points of investigation. <br /> There are no representations, warranties, or guarantees that the results are s <br /> representative of the entire site. Data from this report reflects the conditions at locations <br /> at a specified time. No other interpretation, representations, warranties, guarantees, a <br /> express or implied, are included or intended in the report findings. ;k <br /> ,a <br /> �yC <br /> L- <br /> :4 <br />