My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000730
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:38:03 PM
Creation date
2/15/2019 1:56:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000730
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C 0 R <br /> i <br /> August 17, 2005— SECOR submitted Work Plan for Additional Vertical Site Assessment. <br /> THIS QUARTER ACTIVITIES (Third Quarter 2005) <br /> 1. Performed quarterly groundwater monitoring and sampling (TRC). <br /> 2. Prepared and submitted a quarterly status summary report. <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2005) <br /> 1. Perform quarterly groundwater monitoring and sampling (TRC). <br /> 2. Prepare and submit a quarterly status summary quarterly report. <br /> 3. Implement work plan for additional vertical delineation upon regulatory approval. <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Based on the third quarter groundwater monitoring and sampling and data TPPH, <br /> benzene, and MTBE are laterally delineated to low or non-detectable levels. Installation <br /> of wells MW-17, MW-18, MW-19 (during the first quarter) completed lateral delineation at <br /> the site. SECOR will install deep and intermediate monitoring wells in accordance with <br /> the Work Plan for Additional Vertical Site Assessment dated August 17, 2005, pending <br /> regulatory review and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.