My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000739
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000739
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:51:18 PM
Creation date
2/15/2019 1:59:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000739
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YFK. <br />S E C 0 R <br />Attachment 1. Based on TPPH, benzene, and MtBE isoconcentration maps (Figures 3, <br />4, and 5 in Attachment 1) the plume is delineated in all directions with the exception of <br />northeast of MW -17. <br />REMEDATION STATUS <br />No active remediation. <br />CHARACTERIZATION STATUS <br />Contamination in soil has been adequately delineated. Contamination in groundwater <br />has been delineated in all directions except northeast of well MW -17. Vertical <br />delineation in groundwater has not been completed. <br />WASTE DISPOSAL SUMMARY <br />The volume of purged groundwater generated and disposed of during the quarterly <br />groundwater monitoring event will be reported in TRC's quarterly report. <br />RECENT SUBMITTALS/CORRESPONDENCE <br />None <br />THIS QUARTER ACTIVITIES (Second Quarter 2005) <br />1. Performed quarterly groundwater monitoring and sampling (TRC). <br />2. Prepared and submitted a quarterly summary report. <br />NEXT QUARTER ACTIVITIES (Third Quarter 2005) <br />1. Prepare and submit a quarterly summary report. <br />2. Perform quarterly groundwater monitoring and sampling. <br />3. Submitted SCM dated July 5, 2005. <br />4. Submit work plan for vertical delineation. <br />CONCLUSIONS AND RECOMMENDATIONS <br />Based on the second quarter groundwater monitoring and sampling and data TPPH, <br />benzene, and MtBE are delineated to low or non-detectable levels. Installation of wells <br />MW -17, MW -18, MW -19 (during the first quarter) completed lateral delineation at the <br />site. Based on the SCM dated July 5, 2005, additional vertical delineation is required <br />and SECOR will submit a work plan to complete the assessment during the third quarter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.