Laserfiche WebLink
S E C 0 R <br /> time <br /> proved in TRC's Groundwater Monitoring Report dated November 29, 2004 is <br /> included as Attachment A. Based on TPPH, benzene, and MtBE isoconcent ration maps <br /> (Figures 3, 4, and 5 in Attachment A) the plume is delineated in all directions with the <br /> exception of northeast of MW-16. <br /> REMEDATION STATUS r <br /> No active remediation. 'A <br /> CHARACTERIZATION STATUS <br /> Contamination in soil has been adequately delineated. Contamination in groundwater <br /> has been delineated in all directions except northeast of well MW-16. <br /> WASTE DISPOSAL SUMMARY <br /> The volume of purged groundwater generated and disposed of during the quarterly <br /> groundwater monitoring event will be reported in TRC's quarterly report. <br /> RECENT SUBMITTALS/CORRESPONDENCE <br /> ,i <br /> September 27, 2004 — San Joaquin County approval letter for Work Plan for Well <br /> Installation and Vertical Assessment dated September 7, 2004 <br /> • December 9, 2004 — SECOR submitted San Joaquin County welllboring permit <br /> applications for wells and borings outlined in the Work Plan for Well Installation andY <br /> Vertical Assessment dated September 7, 2004 <br /> THIS QUARTER ACTIVITIES (Fourth Quarter 2004) <br /> 1. Performed quarterly groundwater monitoring and sampling (TRC). Y,r. <br /> 2. Prepared and submitted a quarterly summary report. <br /> NEXT QUARTER ACTIVITIES (First Quarter 2004) F' <br /> 1. Prepare and submit a quarterly summary report. <br /> 2. Perform quarterly groundwater monitoring and sampling. , <br /> 3. Perform well installation and vertical assessment and submit results in a Site <br /> Conceptual Model. <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Based on the fourthy quarter groundwater monitoring and sampling and data TPPH, <br /> benzene, and MtBE are fully delineated with the exception of northeast of well MW-16. <br /> SECOR has submitted a work plan for the installation of additional wells downgradient of <br /> . MW-16 that should complete delineation and San Joaquin County has approved the <br /> work plan. Upon the completion of work outlined in Work Plan for Well Installation and 1' <br /> ;:SF <br />