My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000767
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 3:50:06 PM
Creation date
2/15/2019 2:02:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000767
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,} �{/ <br /> LJ S E`�r OR <br /> Mr Mike lnfurna Y <br /> December 30, 2003 f <br /> Page 2 <br /> a <br /> Assessment dated April 7, 2003 ConocoPhilhps will be submitting an interim remedial action plan <br /> (IRAP) and work plan for onsite ozone system installation by January 30, 2004 (see below), and will <br /> include the completion of vertical assessment to that work plan s <br /> Summary of Proposed Work <br /> As indicated above, ConocoPhdlips will be submitting an interim remedial action plan (IRAP) and <br /> work plan for onsite ozone sparge system installation by January 30, 2004 ConocoPhlllips would like <br /> to install and begin operation of the onsite ozone sparge system during the first half of 2004 which will <br /> prevent the continued migration of the dissolved plume offsite The installation of the ozone sparge <br /> system is intended as an interim remedial action and will be performed in conjunction with work <br /> requested by SJCEHD The following is a summary of work requested by SJCEHD and proposed by <br /> ConocoPhillips <br /> • ConocoPhdlips proposes to submit an IRAP and work plan for onsite ozone system <br /> installation by January 30, 2004 with the goal of installing and beginning operation by June 1, <br /> 2004 The work plan will include the completion of vertical assessment <br /> • ConocoPhdlips has proposed to complete lateral assessment of the plume as outlined in <br /> Addendum to Work Plan for Off-Site Assessment dated April 7, 2003 <br /> • Following the completion of both the vertical and lateral assessment, SECOR will prepare x <br /> • and submit a Site Conceptual Model (SCM)as requested in SJCEHD letter dated May 8, <br /> 2003 <br /> • Following submission of the SCM, a Corrective Action Plan (CAP)and Remedial Action Plan <br /> (RAP)will be prepared as requested by SJCEHD <br /> If there are any questions, please call us at (916)861-0400 <br /> Sincerely, <br /> SECOR Inter atianal, Incorporated �y <br /> No.C ' <br /> Clinton Harms E*12131!06 <br /> Project Scientist <br /> r� <br /> usty enkosky, P <br /> Senior Engineer <br /> Attachments Figure 1 -Site Plan <br /> Attachment A—4th Quarter 2003 Groundwater Laboratory Analytical Report <br /> • cc Mr Ed Ralston, ConocoPhdlips <br /> x <br /> 11ConocoPhill ips\Tosco Marketing112051Work PlansVesponse letter doc <br /> 3 <br /> Y <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.