My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000768
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:29:45 PM
Creation date
2/15/2019 2:04:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000768
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert Cochran - 2 - 12 August 2003 <br /> CChevron Environmental Management Company <br /> shut down the SVE system, due to asymptotic levels of treated contaminants and lack of rebound after <br /> SVE system shutdown <br /> .J 2) I recommend that Chevron conduct computer modeling of the remaining contaminant mass in soil and <br /> groundwater, to determine the pumping rate necessary to maintain hydraulic control and protect <br /> City of Lodi Municipal Well #12 (Well #12), 420 feet southwest of extraction well EX-2 The modeling <br />` — should consider various pumping rates (including no pumping) and locations if soil and groundwater <br /> modeling show no impact to Wel l #12, then the G WE system may also be shut down <br /> 3) Groundwater monitoring will continue after GWE system shutdown, to determine if rebound occurs <br /> During the GWE rebound test, all rnonitonng wells will be sampled quarterly for at least one hydrologic <br /> cycle (one year) If little or no rebound occurs, then Chevron may submit a site closure report <br /> 4) Quarterly groundwater monitoring is required by Regional Board Cleanup and Abatement Order <br /> No 5-00-704 After the soil/groundwater modeling and GWE system rebound test (Comment 2) have <br /> been conducted and the report(s) have been reviewed by Regional Board staff, I recommend <br /> reconsidering Chevron's request to reduce groundwater monitoring, or consider a request for No Further <br /> Action Required at the site <br /> •, 5) The California Registered Geologist listed on the signature page did not sign the Report, as required <br /> by the California Business and Professions Code Submittal of a revised signature page signed by a <br /> California licensed professional engineer or geologist with license number/seal is necessary <br /> ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.