Laserfiche WebLink
CLEANUP AND ABATEM— JT ORDER NO 5-00-704 5 <br /> FORMER CHEVRON STATION #9-5775 <br /> 301 WEST KETTLEMAN LANE <br /> LODI SAN JOAQUIN COUNTY <br /> Quarterly Reporting <br /> II I By 15 July 2000, and the 15th day of the month following each calendar quarter, submit a <br /> quarterly progress report for the fornner Chevron Station #9-5775 site that provides the results of <br /> 1 groundwater monitoring, sample analysis and site work perfonnned during the previous calendar <br /> quarter Groundwater analysis is to include total petroleum hydrocarbons as gasoline benzene, <br /> toluene, ethyl benzene, total xylenes, ethylene dibromide, 1,2-dichloroethane, MtBE, TBA, <br /> 1 D1PE, ETBE, TAME, ethanol, and methanol The quarterly progress reports shall inzlude <br /> a Groundwater elevation contour maps <br />' b Pollutant concentration contour maps <br /> c Groundwater purge data sheets <br /> d Tabular results of current and all previous data <br />' e Narrative describing the work presented in the report, including methodology <br /> f Discussion of the status of investigation and cleanup activities <br /> g Evaluation of the effectiveness of cleanup activities and an estimate of pollutznts treated <br /> versus pollutants remaining <br /> h A schedule for future activities <br /> i Include data from the last three months, document treatment or disposal of ani-, <br />' • <br /> contaminated soil or groundwater generated during the investigation and cleanup <br /> activities <br /> 1 12 If groundwater momtonng indicates the groundwater plume has migrated beyond laterally or <br /> vertically defined lunits during the quarter, the quarterly report shall include a work plan and <br /> schedule, with work to begin within thirty days of report submittal, to define the new plume <br /> ilimits <br /> qAaVj�6X�L-T�DON, EXecutiN e Officer <br /> Dated 20 April 2000 <br /> 1 <br /> • <br /> 1 <br />