Laserfiche WebLink
S E C 0 R <br /> R <br /> b <br /> 5 <br /> Y+' <br /> G <br /> Petroleum hydrocarbons and fuel oxygenates were not detected above laboratory reporting limits in <br /> groundwater samples from borings GP-4 through GP-7 ` <br /> 1 <br /> Groundwater monitoring has been performed since August 1998 Third quarter 2003 groundwater d< <br /> monitoring reported high concentrations (x10,000 ppb) of TPHg in wells, MW-1, MW-5, MW-7, and <br /> MW-9 The highest concentrations of benzene (200 ppb) and MtBE (880 ppb) were found in wells "F <br /> MW-5 and MW-12, respectively Groundwater flow was to the north-northwest with a gradient of <br /> approximately 0 002 to 0 003 ft/ft (Attachment 1) Depth to groundwater ranged from 11 82 (MW-11) ; <br /> to 15 19 (MW-3) feet bgs (Attachment 1) <br /> x <br /> RECENT QUARTER ACTIVITIES (Third Quarter 2003) <br /> 1 Performed quarterly groundwater monitoring and sampling (GRi) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Perform off-site assessment <br /> 4 <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2003) <br /> ! 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling <br /> 3 Sample irrigation well pending access <br /> 4 Perform irrigation well influence study pending access <br /> 5 Submit Site Conceptual Model <br /> ,.y <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? In all direction except Northeast of well <br /> MW-12 m <br /> Free product delineated? NIA <br /> Soil remediation in progress? No <br /> Start? NIA <br /> Anticipated completion date? N/A � <br /> RECOMMENDATIONSIDISCUSSIONS <br /> Offsite assessment northeast of well MW-12 is being conducted in mid-September 2003 Results of <br /> the assessment verifying delineation of the plume are anticipated to be available in early October <br /> 2003 As of the date of this letter, Lathrop Grammer School was reviewing ConocoPhdlips request to <br /> access their irrigation well for sampling Lathrop Grammer School has indicated to Mr Ed Ralston <br /> with ConocPhillips that they expect to approve the access agreement during the week of September <br /> d <br /> i <br />