Laserfiche WebLink
SECOR <br /> HEALTH AND SAFETY PLAN <br /> REVIEW AND APPROVAL <br /> CLIENT Tosco Corporation SITE NAME Tosco#1205 <br /> PROJECT NAME Off-site geoprobe assessment PROJECT NUMBER 77TO 43870 00 0106 <br /> START DATE February 30, 2002 END DATE August 30 2002 <br /> PLAN EXPIRATION DATE August 30, 2002 <br /> (Last day of expected fieldwork or no longer than 6 months) <br /> Thomas Y Parker Signature Date <br /> Plan Completed By <br /> Rusty Benkosky Signature Date <br /> Project Manager <br /> Site Health and Safety Officer Signature Date <br /> Todd Brown Signature Date <br /> Wffice Health & Safety Officer <br /> Developed from JSA —Monitoring Well Instal lation/Development/Samp]mg dated March 30, 2000 <br /> This Health and Safety Plan has been written for the use of SECOR and its employees It may <br /> also be used as a guidance document by properly trained and experienced SECOR <br /> subcontractors However, SECOR does not guarantee the health or safety of any person entering <br /> these sites <br /> Due to the potential hazardous nature of these sites and the activities occurring thereon, it is not <br /> possible to discover, evaluate, and provide protection for all possible hazards which may be <br /> encountered Strict adherence to the health and safety guidelines set forth herein will reduce, but <br /> not eliminate, the potential for injury The health and safety guidelines in this Plan were <br /> prepared specifically for this site and should not be used on any other site without prior research <br /> by trained health and safety specialists <br /> SECOR claims no responsibility for its use by others The Plan is written for the specific site <br /> conditions, purposes, dates, and personnel specified and must be amended if these conditions <br /> change This plan will provide useful information to subcontractors which will assist them in <br /> developing their own HASP, but it should not be construed as a substitute for their own plan <br /> Subcontractors should sign this plan as an acknowledgement of hazard information and notice <br /> that this Plan does not satisfy their requirement to develop their own plan <br />