Laserfiche WebLink
• <br /> Scope of Work: The purpose of this project is to drill five off-site geoprobe borings and, if necessary, an <br /> additional five step-out geoprobe soil bonngs and collect soil and groundwater samples from each boring <br /> j1hThe site is a 170 by 170 foot square-shaped parcel located on northeast corner of Cambridge Street and Louise <br /> Avenue in Lathrop, California, and is an operating Circle K and TOSCO service station <br /> In November 1997, Pacific Environmental Group (PEG) performed oversight and sampling during the removal <br /> of one 4,000-gallon and two 10,000-gallon underground storage tanks (UST's), product dispensers, and <br /> associated product piping from the site during facility upgrade activities Approximately 1,241 tons of <br /> hydrocarbon impacted soil from beneath the UST's and from the new tank pit excavation Additionally, <br /> approximately 17,000 gallons of hydrocarbon impacted groundwater from the new tank pit excavation Total <br /> petroleum hydrocarbons as gasoline (TPHg) were reported at concentrations ranging from 130 ppm to 5,800 <br /> ppm Methyl tert-butyl ether(MtBE) was reported in soil at concentrations ranging from 0 19 ppm to 3 6 ppm <br /> In July1998, one Geoprobe Tm boring was advanced to a depth of 40 feet below ground surface (bgs) <br /> downgradient (north) of the former UST excavation Laboratory analysis of soil reported maximum <br /> concentrations of TPHg and MtBE of 1,900 ppm (GP-I-10') and 0 31 ppm (GP-1-10'), respectively <br /> Laboratory analysis of groundwater reported concentrations of TPHg and MtBE of 52,000 ppb and 61 ppb, <br /> respectively <br /> From August through September 1998, IT Corporation (IT) dnlled and installed four groundwater monitoring <br /> wells (MW-1 through MW-4) to approximate depths of 26 to 28 feet bgs Laboratory analysis of soil reported <br /> maximum concentrations of TPHg and MtBE of 6,800 ppm (MW-3-16') and 7 2 ppm (MW-2-1 i'), <br /> respectively Laboratory analysis of groundwater reported maximum concentrations of TPHg and MtBE of <br /> 29,000 ppb (MW-1) and 4,000 ppb (MW-2), respectively <br /> On December 2000, IT drilled and installed five groundwater monitoring wells (MW-5 through MW-9) to <br /> approximate depths of 24 feet bgs Laboratory analysis of soil reported maximum concentrations of TPHg and <br /> MtBE of 473 ppm (MW-9-10') and 0 119 ppm (MW-6-20'), respectively Laboratory analysis of groundwater <br /> reported maximum concentrations of TPHg and MtBE of 72,000 ppb (MW-6) and 750 ppb (MW-6), <br /> respectively <br /> Groundwater monitoring has been performed since August 1998 Fourth Quarter 2001 groundwater monitoring <br /> reported high concentrations ( 10,000 ppb) of TPHg in wells MW-1, MW-5, MW-6, MW-7, and MW-9 The <br /> highest concentrations of benzene and MtBE were 780 ppb (MW-7) and 660 ppb (MW-6) Groundwater flow <br /> was to the northeast with a gradient of approximately 0 001 ft/ft Depth to groundwater ranged from 12 50 <br /> (MW-9) to 14 32 (MW-3) feet bgs <br /> All work for this project will be scheduled during typical daylight hours <br /> Site plan is in Attachment 1. <br /> Emergency Response: <br /> A. Injury or Illness: <br /> If an injury or illness occurs, take the following action <br /> Determine if emergency response (fire/ambulance) staff is necessary If so, dial 911 on cell phone or <br /> closest available phone, which is located in the station building If it makes sense to take an individual to <br /> the hospital, use the directions on page 2. <br /> SECOR International Incorporated 4 <br />