Laserfiche WebLink
(26 ppb) were found in wells MW-5 and MW-2, respectively Groundwater flow was to the <br /> southeast with a gradient of approximately 0 0002 to 0 0006 ft/ft (Figure 1) Depth to <br /> groundwater ranged from 12 59 (MW-9) to 14 45 (MW-3) feet bgs (Attachment A) <br /> RECENT QUARTER ACTIVITIES (Third Quarter 2002) <br /> 1 Performed quarterly groundwater monitoring and sampling (GRI) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Submitted"Addendum to Work Plan for Additional Off-Site Assessment" dated July 16, <br /> 2002 <br /> 4 Submitted "Addendum#2 to WP for Additional Off-Site Assessment" dated August 15, <br /> 2002 <br /> NEXT QUARTER ACTIVITIES (Fourth Quarter 2002) <br /> 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling (GRI) <br /> 3 Coordinate and perform additional off-site subsurface assessment <br /> 4 Prepare and submit off-site subsurface assessment report <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? Yes, with geoprobe investigation <br /> Free product delineated? NIA <br /> Soil remediation in progress? No <br /> Start? NIA <br /> Anticipated completion date? NIA <br /> CONSULTANT. SECOR International Incorporated <br />