My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000777
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 5:01:46 PM
Creation date
2/15/2019 2:21:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000777
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GETTLER - RYAN INC. <br /> May 28, 2002 <br /> G-R Job #180183 <br /> Mr Edward C Ralston <br /> Phillips 66 Company <br /> 1380 Lead Hill Road, Suite 120 <br /> Roseville, California 95661 <br /> RE- Second Quarter Event of April 29, 2002 <br /> Groundwater Monitoring & Sampling Report <br /> Tosco (Circle K) Unit#01205 <br /> 16470 Cambridge Street <br /> Lathrop, California <br /> Dear Mr Ralston <br /> This report documents the most recent groundwater monitoring and sampling event performed by Gettler- <br /> Ryan Inc (G-R) at the referenced site All field work was conducted in accordance with G-R Standard <br /> Operating Procedure -Groundwater Sampling(attached) <br /> Static groundwater levels were measured and all wells were checked for the presence of separate-phase <br /> hydrocarbons Separate-phase hydrocarbons were not present in the wells Static water level data and <br /> groundwater elevations are summarized in Table I A Potentiometric Map is included as Figure 1 <br /> Groundwater samples were collected from the monitoring wells as specified by G-R Standard Operating <br /> Procedure - Groundwater Sampling (attached) The field data sheets are also attached The samples were <br /> analyzed by Sequoia Analytical Analytical results are summarized in Tables I and 2 A Concentration Map <br /> is included as Figure 2 The chain of custody document and laboratory analytical reports are also attached <br /> Sly, <br /> RED GiE <br /> Deanna L Harding <br /> Proj et oordinator <br /> No 6882 <br /> Dougl J ee <br /> Senior eologist,R G No 6882 '9 <br /> lF OF CAL�FO <br /> Figure I Potentiometric Map <br /> Figure 2 Concentration Map <br /> Table 1 Groundwater Monitoring Data and Analytical Results <br /> Table 2 Groundwater Analytical Results-Oxygenate Compounds <br /> Attachments Standard Operating Procedure- Groundwater Sampling <br /> Field Data Sheets <br /> Chain of Custody Document and Laboratory Analytical Reports <br /> OS 265 qml <br /> 6747 Ste rra Court , Suite J Dublin , California 94568 ( 925 } 551 - 7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.