Laserfiche WebLink
(i rl <br /> found in wells MW-9 and MW-6, respectively Groundwater flow was to the northeast with a <br /> gradient of approximately 0 001 ft/ft (Figure 1) Depth to groundwater ranged from 1157 (MW- <br /> 9) to 13 42 (MW-3) feet bgs (Attachment A) <br /> RECENT QUARTER ACTIVITIES (Second Quarter 2002) <br /> 1 Performed quarterly groundwater monitoring and sampling (GRT) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Submitted DPE feasibility testing report <br /> 4 Completed the first phase of an off-site subsurface assessment on June 5, 2002 <br /> NEXT QUARTER ACTIVITIES (Third Quarter 2002) <br /> 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling (GRI) <br /> 3 Coordinate and perform additional off-site subsurface assessment <br /> 4 Prepare and submit off-site subsurface assessment report <br /> CHARACTERIZATIONIREMEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? No <br /> Free product delineated? NIA <br /> Soil remediation in progress? No <br /> Start? NIA <br /> Anticipated completion date? N/A <br /> CONSULTANT: SECOR International Incorporated <br />