My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000778
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 3:48:11 PM
Creation date
2/15/2019 2:21:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000778
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Li Steps with Hazard Assessments and Precautions is <br /> Field staff must review fob-specific work pian and coordinate with protect manager to verify that all up-front logistics are completed prior to stamng work including,but not limited to,permitting, <br /> access agreements,and notification to required contacts(e g site managers,inspectors,clients,subcontractors,etc) A tailgate safety meeting must be performed and documented at the beginning of <br /> each workday Safe Performance Self Assessment SPSA must be used throughout the Mect. Weather conditions(heat,cold,rain, must also be considered. <br /> 0 Job Steps 0 Potential Hazard 0 Critical Actions <br /> Soil Boringf%H histalllWell DevelopmenUGroundwater Sampling <br /> Clear drilling locations Traffic hazards,overhead and References Borehole Clearance Review fora and coordinate with <br /> underground installations,product Station Manger(or designee)to minimize potential conflicts Review <br /> releases,property damage,dealer proposed locations against available construction drawings and known <br /> inconvenience utilities,tanks,product lues,etc Mark out the proposed borehole <br /> locations Call underground utility locating service for public line <br /> location clearance and get list of utilities being contacted.If <br /> Egpn <br /> Mobilize with proper equipment(supplies for drilling Vehicle accident Lifter hazards Dela Follow safe vete line locator for nate <br /> g Y driving procedures Employ safe lifting procedures <br /> or improper performance of work due to Make sure sub-contractors are aware of their responsibilities for labor, <br /> improper equipment onsite equipment and supplies Review HSP and permit conditions and <br /> gather necessary PPE <br /> Visually clear proposed drilling locations Underground and overhead installations Complete Pre-Mobilization section of Borehole Clearance Review <br /> form and adjust drilling locations as necessary <br /> Set up necessary traffic control Struck by velude during placement. Use buddy system for placing traffic control Reference traffic control <br /> Vehicle accident as a result of improper plan section of HSP(may include specific requirements based on <br /> traffic control meat laeeinmt ts) <br /> Assist with set up of ng Vehicle accident during ng movement. Verify clear pathway to dnMng location and clearance for raising <br /> Damage caused by ng while accessing mast Provide as needed hand signals and guidance to driver to place <br /> set-up location Contact with overhead ng Visually inspect ng(fire extinguisher on board,no oil or other <br /> installations Soft terrain. Rig fluid leaks,cabling and associated equipment in good condition, <br /> movement pressurized hoses secured with whip-checks or adequate substitute, <br /> hacks in good condition?) If necessary,use wooden blocks under <br /> jacks to spread load Chock wheels <br /> Set up exclusion zone(s)and work stations(drilling and loggmg/sample Struck by vehicle during set up Shp/fall Implement exclusion zone set-up instructions of HSP Set up work <br /> collection hazards stations with clear walking paths to and from n <br /> Clear upper five feet of borehole using post-hole digger or bucket auger Back strain,exposure to chemical Don any additional PPE and initiate air quality monitoring in <br /> hazards,hitting an underground utility, accordance with the HSP Stand upwind to avoid exposure whenever <br /> repetitive motion possible Use the PID to track the airborne concentration of <br /> contaminants close to potential sources such as the core as it is being <br /> raised from the hole,the core is opened,etc Have respirator ready <br /> with organic vapor cartridges on your belt,readily available. Evaluate <br /> the sample inside the baggie at arm's length. DO NOT EVALUATE <br /> THE SAMPLE IN THE OPEN THIS WILL AVOID <br /> UNNECESSARY EXPOSURE Use proper lifting techniques and <br /> tools Complete the Pre-Drilling section of the Borehole Clearance <br /> Review form. <br /> Commence direct-push drilling Cross-contamination from previous hole Decontaminate sampling after collecting a sample and decontaminate <br /> back strain,heat or cold,eye mM, drilling equipment after each borehole Use proper lifting techniques <br /> noise,exposure to cheuical hazards, Use PPE and monitoring in accordance with HSP(especially note ear <br /> _kthng an underground utile , trip andprotection) Monitorq21 Ling s KeM work area clear of <br /> SECOR International Incorporated 12 HASP- <br />
The URL can be used to link to this page
Your browser does not support the video tag.