Laserfiche WebLink
Field w jo c work plan and coordinate with project manager to venfy that JWfront logistics are completed prior to statting work including,but not hnu taming <br /> access d notification to required contacts(eg site managers,inspectors,clients,suboontractors,etc.) A tailgate safety meeting must be performed and documented at the begmmng of <br /> each workday Safe Performance Self Assessment SPSA must be used throughout the project Weather conditions eat,cold,rani,h must also be considered. <br /> O Job Steps O Potential Hazard ® Critical Actions <br /> Soil Bonug/Well lwtalllWell Developmeirt/Grouiudwater Sampling <br /> imtabihty Onset of any of these signs are indications for mimedrate <br /> return to a heated shelter <br /> Heat Stress For tempaatiu+es above 75/F, each person will take their pulse at rest <br /> At breaks,the pulse should be less than 110 beats per minute after one <br /> mmute. Before retuming to work, the pulse should be no more than <br /> 10 beats greater than the resting pulse. <br /> If the air tele is greater than 95/F, work should be done for <br /> 30 minutes with a rest break of 10 minutes for Level D For Level G <br /> work should be done for 20 minutes,with a rest break of 10 mmutes At <br /> least 8 ounces(1 cup)of cool water,Gatorade-type drink,or dihite fruit <br /> juice should be consumed at each rest break or at least one alp every 20 <br /> minutes <br /> Work should stop if any of the following symptoms octan- muscle <br /> spasm and/or pain in the limbs or abdomen(heat cramps),weak pulse, <br /> heavy sweating, dizziness, and/or fatigue (heat exhaustion), or rapid <br /> pulse, no sweatng, nausea, dimness, and/or confusion (heat stroke) <br /> Provide First Aid immediately <br /> Use sunscreen on unprotected skin to protect against ultraviolet <br /> exposure as necessary <br /> No eating,drinking,or smoking on-site <br /> No contact lenses on-site <br /> No facial hair that would interfere with respirator fit. <br /> A safety meeting will be held each day,even if there is only one person worlang Topics will always include the work scheduled for the day and <br /> on the project on any given day restatement of the hazards and means to avoid them. Other topics <br /> may include sampling in general and advances in technology and how <br /> it may be applied to the project. Use Attachment 6 for logging the <br /> topics discussed. <br /> SECOR Irrternatronal Incorporated 14 HASp_geopmbe <br />