My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
3500 - Local Oversight Program
>
PR0544155
>
ARCHIVED REPORTS XR0000782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:56:53 PM
Creation date
2/15/2019 2:24:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000782
RECORD_ID
PR0544155
PE
3526
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
02
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. CHARACTERIZATION/REMEDIAL STATUS <br /> Impacted soil delineated? Lateral Yes <br /> Vertical Yes <br /> Impacted groundwater delineated? No <br /> Current phase of project9 Groundwater monitoring and Assessment <br /> Frequency of sampling? Quarterly <br /> Current remediation techniques? N/A <br /> Soil remediation to progress? No <br /> Anticipated start? N/A <br /> Anticipated completion? N/A <br /> Groundwater gradient9 North-Northeast at 0 0015 ft/ft <br /> Dissolved/free product remediation in progress? No <br /> Anticipated start? N/A <br /> Anticipated completion? N/A <br /> CONCLUSIONS: <br /> The lateral extent of soil impacts is generally defined with the exception of the capillary fringe <br /> The off-site soil impacts are likely due to migration of impacted groundwater away from the site <br /> . Off-site upgradient groundwater impacts are delineated by well MW-8 Groundwater sampling <br /> results for off-site wells MW-5, MW-6, and MW-9 indicate that the groundwater impacts are <br /> undefined downgradient of the site The highest detected dissolved benzene and MTBE <br /> concentrations are in well MW-5, located approximately 30 feet downgradient of the USTs <br /> RECOMMENDATIONS: <br /> IT recommends preparing a workplan for further groundwater investigation that includes a <br /> groundwater grab sampling program to further delineate the shallow groundwater impacts The <br /> grab sample data will be evaluated prior to proposing monitoring well locations The tentative <br /> schedule for further assessment is 1) workplan submittal in the fourth quarter 2001, 2) obtaining <br /> required access agreements and permits during the fourth quarter 2001 or beginning of the first <br /> quarter 2002, and 3) implementation of the assessment during the first quarter 2002 <br /> CONSULTANT: IT Corporation <br /> i <br /> 1205/822125 lba doc 3 10/18/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.