Laserfiche WebLink
qco'rporatiom <br /> May 15, 2000 A Member of The IT Groep <br /> Mr Ed Ralston <br /> Page 4 <br /> If there are any questions regarding the contents of this work plan,please call us at (916) 928- <br /> 3300 <br /> Sincerely, <br /> IT Corporation <br /> Kathleen A Waldo <br /> Staff Engineer <br /> Mark Capps <br /> Project Geologist <br /> . RG 6561 <br /> Attachments Figure 1 --Site Location Map <br /> Figure 2—Proposed Groundwater Monitoring Well Locations <br /> Attachment A—Draft Site Specific Health and Safety Plan <br /> Attachment B—Field and Laboratory Procedures <br /> cc Mr Michael Infurna, San Joaquin County Environmental Health Department <br /> Mr Warren Hartzell,Regional Water Quality Control Board, Central Valley Region <br /> 11SACRFp11COMMON\Tancfpl\Projects\Projects\9111005\1001021WorkPlan doc <br />