My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:18:00 PM
Creation date
2/15/2019 2:47:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, <br /> Mr.James L.L.Barton Flag City Chevron <br /> OLodi,California <br /> October 19,2011 <br /> Page 4 of 4 <br /> pumped into each borehole using tremmie pipe. Surface completions will match the <br /> surrounding surface. <br /> The well boxes for each monitoring well will be removed using a jack hammer and the resultant <br /> void filled with concrete and/or matched to finished grade. <br /> Waste Management <br /> Soil cuttings and water generated during drilling and well obstruction removal activities will be <br /> stored on-Site in properly labeled 55 gallon containers and/or on plastic visqueen pending waste <br /> characterization. Waste will be disposed in accordance with applicable laws and regulations <br /> and as approved by the CRWQCB. <br /> Upon completion of well destruction and residual materials disposal activities, SGI will issue a <br /> Letter Report documenting the completion of these activities. <br /> PROJECT SCHEDULE <br /> SGI plans to commence work immediately following the approval of the work plan by CRWQCB. <br /> SGI estimates well destruction activities will take two weeks to complete. The Letter Report <br /> documenting completion of field activities and residual materials disposal will be issued within <br /> three weeks of receipt of final bills of lading for materials disposal. <br /> I <br /> If you have any questions or require additional information, please do not hesitate to call Mr. <br /> Greg McIver at(530) 272-4200 or James Ritchie at (650) 394-4774. <br /> � "G <br /> I\ <br /> Sincerely, 6.R�T�' �c <br /> The Source Group.Inc. Y" <br /> I <br /> No.49T4 <br /> Fol Greg McIver j Ja es G. Ritchie, OF L <br /> Project Manager `--f5irincipal Geologist <br /> i <br /> Attached: <br /> Table 1: Well Construction Details <br /> Appendix A: Regulatory Correspondence <br /> Appendix B: Site Location Map and Site Plan <br /> Appendix C: Well Completion Logs <br /> Cc: Mr. Mike Infurna, SJCEHD <br /> Marisa Rodarte, State Water Resources Control Board, UST Cleanup Fund <br /> Conrad Lewis, DGS, Real Estate Division, 707 3r° St., West Sacramento 95605 <br />
The URL can be used to link to this page
Your browser does not support the video tag.