My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012758
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0012758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 4:45:15 PM
Creation date
2/15/2019 2:49:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012758
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,a...: <br /> �� rt.' S„""S .'"&.,' b.nr +6•-3'+e. ,:�,.:, _ <br /> C9�. <br /> e � <br /> F <br /> rt i� it <br /> 1/ <br /> SIERRA <br /> SES STANDARD OPERATING PROCEDURE <br /> q WELL DEVELOPMENT <br /> €s <br /> 5E�5 cievcloPs ground water nlonsturing;t:,clls nut less than.i8 hours after the placement <br /> of the surface seal (91'outing) to allot%, sull-icieut tiltic for the cement grout to set. The wells are <br /> dcrrin{xd to rcslore the rlaiural hydraulic collductivtly of the forntaliotl(s) to be ntonilorcd and <br /> h to remove all sand 1111d as much lino-9r;l1at tnalcrial as possible, <br /> Prior to dcvc10Pnlc111.SPS field persolluel nleasurc the depth to water and the total depth <br /> 3 of the well. The total depth measurement is compared t(t the;veli complctian diagram shown on <br /> tau liel(i lag;and ,uly discr(pauctca arc nu[c(l. <br /> Well develaput(nt cotlsists of several cycles of surginf an(I evacuation of water to the well, <br /> each ending;with ttleastlretnerits of temperature, pH, coll(luetivtty, and observation of turbidity. <br /> Surg;tng takes place for several minutes to loosen linesfronl the screened interval. Positiatt <br /> vented surge block several feet belnw the water surface and surge with an upward motion, <br /> Development shall colltillue fur a Period of at least four]lours or when ten well volumes <br /> have been removed,whichever occurs first.and until ground water removed from the well is clear <br /> and visibly free of suspended materials. Note the tante and the 1pproxlntate volume of water <br /> removed prior to each delerminatiotl Of tile. following parameters (and whether well is bailed or <br /> pumped dry): pill, temperature,and spoiNfic colic]uctivity. 'lllese nteasurculents Should be Made <br /> a mhlilnunl of fiv_ times during,well development. <br /> If the water is stili cloudy after tae four hour period but these three parameters have <br /> stabilized, then the well will be considered developed regardless of the volume of wsder purged <br /> front the well. Stablhr:aiort of PH, temPcrutu['a'. and specific conductivity will be considered to <br /> ]rave occurred when these parameters undergo changes <br /> not exp-Ceding;:to.1, 0.5 degrees F. and <br /> g percent, respectively. <br /> fly--,:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.