My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000646
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 6:22:12 PM
Creation date
2/15/2019 3:07:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000646
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 07 November 2004 <br /> AGE-NC Project No 96-0232 <br /> Page 5 of 11 <br /> Because MTBE is well below the EPA recommended 100 atmospheres, air sparging would be <br /> considered ineffective as a remediation alternative <br /> Another concern with IAS is precipitation of iron and/or manganese, which can cause clogging of <br /> sparging points Laboratory analysis of iron at the site (Appendix B) indicated that iron <br /> concentrations in ground water at the site are adequate for IAS <br /> 415 Duration <br /> Air sparging conducted in non-conducive conditions generallyresult in extensive remediation rates <br /> At the site, we would estimate an extended remediation period of at least 48 to 60 months for <br /> remediation of MTBE-impacted ground water <br /> 4 1 6 Estimated Cost <br /> • Installation of an IAS system would most likely require the installation of one to two additional IAS <br /> wells located near well MW-8,installation of several SVE wells,installation of an SVE/IAS piping <br /> system and installation of SVE/IAS equipment SVE/IAS setup costs would likely range from <br /> $50,000 to $75,000 Spargmg equipment, utility, maintenance and monitoring would range from <br /> $5,000 to $10,000 annually Based upon a treatment period of 48-60 months, the total costs would <br /> be in the range of$70,000 to $125,000 <br /> 42 IN-SITU OZONE SPARGING <br /> IOS utilizes ozone injection to destroy organic chemicals through the process of chemical oxidation, <br /> which breaks the targeted organic chemical down into carbon dioxide and water Ozone is a highly <br /> reactive chemical that has proven to be effective in destroying a wide variety of organic chemicals <br /> including MTBE <br /> 4 2 1 Principles <br /> Ozone sparging is generally introduced to the subsurface as a gas phase through traditional air sparge <br /> wells Ozone is a relatively unstable molecule comprised of three oxygen atoms(03),the instability <br /> means that ozone will have a short life-span and will degrade rapidly(generallyjust a few minutes) <br /> Because of its instability, ozone cannot be generated and stored for future use, rather, it must be <br /> generated and immediately used for IOS treatment <br /> Advanced GeoE nviron mental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.