My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000658
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 8:06:41 PM
Creation date
2/15/2019 3:10:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000658
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 15 October 2000 <br /> AGE-NC Project No 95-0232 <br /> Page 9of 11 <br /> discharge permit, venfied by analytical testing of the water discharge, to quantify any excursions <br /> beyond target limits set within the permit The quantity of water discharge will be insignificant <br /> compared to the peak-flow season (Apnl-September) <br /> 32 Demonstration Of Compliance With Receiving Water Limitations (Section E) <br /> To demonstrate compliance with Section E of General Order No 5-00-119, Flag City Chevron will <br /> follow the RWQCB's Monitoring and Reporting Program in Attachment B of General Order No 5- <br /> 00-1 19 for Receiving Water Monitoring standards <br /> The point of discharge Into the canal will be located in an area near the southeast nntcrsection of <br /> Thornton Road and De Broggi Road Sampling ports will be installed to monitor the effluent of the <br /> pre-treated water from the Flag City Chevron site Furthermore, receiving water momtonng stations <br /> (R-1 and R-2)would be set up 50 feet upstream and 50 feet downstream from the point of discharge <br /> in the canal to monitor the effluent and the general water conditions of the canal AGE anticipates <br /> a continuous discharge of treated ground water from Flag City Chevron to the canal at a flow rate <br /> of approximately 25 GPM <br /> Receiving water moiutonng will include monthly field measurements and observations for the <br /> presence or absence of dissolved oxygen, suspended matter, discoloration, bottom deposits, aquatic <br /> life, sheen, visible film, fungi and any potential nuisance conditions field measurements and <br /> observations will be recorded in notebooks and reported in quarterly reports and submitted to the <br /> RWQCB <br /> 3 3 Discharge To A Publicly Owned Or Operated Storm Water Collection Or Conveyance <br /> System <br /> Not applicable <br /> 4.0. PY;BLIC NOTICE REQUIREMENTS <br /> In accordance with Section D of Attachment A from General Order 5-00-119, AGE has prepared the <br /> below mentioned public notice requirements <br /> 4 1 . List Of Names And Mailing Addresses Of Nearby Residents <br /> The following is a list of names and mailing addresses of nearby residents, including all adjacent <br /> property owners, and all residents within a 500-foot radius of the treatment system and discharge <br /> Advanced GeoEnvran mental,Inc t <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.