' 15 October 2000 <br /> AGE--NC Project No 96-0232 t <br /> Page 4of15 ; <br /> a , <br /> 3 1 INSTALLATION PROCEDURES <br /> ,Two soil borings/ground water extraction wells (EW-2 and EW-3) were advanced at the site for <br />' supplement the aquifer pump testing Soil boring EW-2 was advanced vertically to a depth of 35 feet <br /> below surface grade (bsg) utilizing a CME-85 high-torque, truck-mounted drill ng equipped with <br /> 1'0'/4-inch diameter hallow-stem augers, soil boring EW-3 was advanced vertically to a depth of 50 <br /> feet bsg Soli cuttings were stockpiled on and covered by plastic sheeting in the northeast portion of <br /> the site in an area lacking public access. The soil boring location is depicted m Figure 2 <br /> 311 Logging ` <br />' During drilling activities, soil samples were not collected for laboratory analysis or observation <br /> Boring logs documenting the as-built well installations are included as Appendix D <br /> 3 12 Equipment Decontamination <br /> • The hollow stem augers were steam cleaned prior to each bore hole advancement Following drilling, <br /> , <br /> rmseate generated from decontaminating the equipment was placed in properly labeled D O T - <br />' approved model 17H 55-gallon drums and was stored at the site in an area lacking public access <br /> r <br /> 32 WELL COMPLETION <br /> Soil bonngs EW-2 and EW-3 were single-completed'as ground water extraction wells utilizing <br />' schedule 40, 4-inch diameter blank polyvinylchloride (PVC) well casing and perforated, 4-inch <br /> diameter PVC well casing (0 020-inch slot) G <br /> 1 The ground water extraction well was installed by placing a PVC well casing assembly through the <br /> hollow stem of the augers to the total depth of the boring The augers were incrementally raised as <br /> i No 3 Lonestar Lapis Luster sand(filter pack)was slowly poured down the annulus between the well <br />' casing and the inner wall of the hollow stem auger The filter pack was placed adjacent to the <br /> screened casing from the bottom of the boring to a point approximately two feet above the top of the <br />' r screen, following filter pack placement, a surge block was inserted into the well casing and was <br /> alternately raised and lowered(surged)repeatedly for approximately 20 minutes Approximately two <br /> feet of bentonite pellets (transition seal) were placed above the filter pack and allowed to hydrate <br />' with clean tap water The remainuig annular space was backfilled with portland cement As-built <br /> well-construction diagrams are included as Figures 3 and 4 <br /> r <br /> Advanced GeoEavironmentai,Inc <br />