My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000661
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 6:54:56 PM
Creation date
2/15/2019 3:13:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000661
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1 0 INTRODUCTION AND SCOPE OF WORK 1 <br /> 2 0 CONTINUED INTERIM REMEDIATION AT EW-1 2 <br /> 2 1 GROUND WATER EXTRACTION FROM EW-1 2 <br /> 22 COLLECTION OF EW-1 GRAB GROUND WATER SAMPLES 2 <br /> 2 2 1 Laboratory Analysts Of EW-1 Water Samples 2 <br /> 2 2 2 Laboratory Results Of EW-1 Water Samples 3 <br /> 30 INSTALLATION OF GROUND WATER EXTRACTION WELLS 3 <br /> 3 1 EXTRACTION WELL INSTALLATION PROCEDURES 3 <br /> I 311 Logging 4 <br /> 3 1 2 Equipment Decontamunation 4 <br /> 3 2 EXTRACTION WELL COMPLETION 4 <br />' 33 EXTRACTION WELL DEVELOPMENT 4 <br /> 40 INSTALLATION OF GROUND WATER EXTRACTION PUMPS 5 <br /> I <br /> 50 INSTALLATION OF GROUND WATER PUMP AND TREAT SYSTEM 5 <br /> 5 1 TRENCH SYSTEM INSTALLATION 5 <br /> 52 UNDERGROUND PIPING INSTALLATION 6 <br /> 53 GROUND WATER PUMP AND TREAT SYSTEM INSTALLATION 6 <br /> 54 OFF-SITE TREATED WATER DISCHARGE PIPELINE INSTALLATION 7 <br /> 60 GROUND WATER PUMP AND TREAT SYSTEM START-UP .. .. 8 <br /> 6 1 BACKGROUND SOIL SAMPLE COLLECTION 8 <br /> 62 START-UP GRAB WATER SAMPLING PROCEDURES 9 <br /> 63 START-UP GRAB WATER ANALYTICAL RESULTS 9 <br /> 64 START-UP PUMP AND TREAT WATER DISPOSAL 9 <br /> 70 PUMP AND TREAT SYSTEM OPERATION AND MAINTENANCE 10 <br /> I 7 1 PUMP AND TREAT OPERATION 10 <br /> 72 INFLUENT MONITORING 10 <br /> 73 EFFLUENT MONITORING I 1 <br /> 74 RECEIVING WATER MONITORING 12 <br />' 80 QUARTERLY GROUND WATER MONITORING AND SAMPLING EVENT 12 <br /> 8 1 MONITORING WELL PURGE PROCEDURES 13 <br />' <br /> 82 GROUND WATER SAMPLING 13 <br /> 83 LABORATORY ANALYSIS OF GROUND WATER SAMPLES 14 <br /> 84 FINDINGS 14 <br /> 8 4 1 Ground Water Elevation And Gradient 14 <br />' 8 4 2 Laboratory Results Of Ground Water Samples 15 <br /> 90 SUMMARY OF FINDINGS FROM QUARTERLY ACTIVITIES 16 <br />' 100 CONCLUSIONS 18 <br />' 110 RECOMMENDATIONS 19 <br /> . 120 LIMITATIONS .. 20 <br /> 1 Advanced GeoEnvironrnental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.