My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000662
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 6:29:56 PM
Creation date
2/15/2019 3:15:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000662
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QU ■3 <br /> . 30 October 2004 <br /> AGE-NC Project No 96-0232 <br /> Page 10 of 14 <br /> Analytical Inc Work Order 0409206) and chain of custody forms are presented in Appendix G, <br /> GeoTracker confirmation pages of the submitted laboratory electronic deliverable format(EDF)files <br /> are Included in Appendix H <br /> 4.0. SUMMARY OF FINDINGS FROM QUARTERLY ACTIVITIES <br /> Previous soil characteristics data obtained by a CPT investigation enabled AGE to define five <br /> Informal hydrogeologlc units (Final Remediation Plan, dated 31 August 2000) The Informal <br /> hydrogeologlc units were defined as First Zone (10-35 feet bsg), Second Zone (40-60 feet bsg), <br /> Rocky's Upper Zone (65-75 feet bsg), Secondary Aquifer Zone (85-105 feet bsg), and Primary <br /> Aquifer Zone (130-150 feet bsg) The Rocky's Upper Zone was the shallowest groundwater zone <br /> screened in the destroyed Rocky's domestic drinking water well <br /> The results of pump and treat ground water remediation between 15 June 2004 and 17 August 2004 <br /> is as follows <br /> • Approximately 885,468 gallons of MTBE-impacted ground water were continuously <br /> extracted from wells EW-4, EW-5, EW-7, EW-8 and EW-10, which are completed in the <br /> First Zone aquifer (Appendix A) A total volume of approximately 27,086,201 of MTBE- <br /> impacted water has been treated at the site since the start-up period in November 2000 <br /> (Table 5) <br /> • Ground water pump-and-treat operations were suspended at the site on 17 August 2004 due <br /> to the lack of cost-effectiveness for clean-up of MTBE-impacted ground water <br /> • MTBE concentrations were detected from the July 2004 monthly water samples collected at <br /> the influent end of the treatment system at a concentration of 47 µg/l <br /> • Laboratory analysis of pump-treat effluent samples and did not detect any MTBE during the <br /> third quarter 2004 <br /> • Between 15 June 2004 and 17 July 2004, the mass of MTBE removed from the extracted <br /> ground water was calculated to be 0 3 5 pounds(Table 5,Appendix C) A plot of cumulative <br /> ground water pump and treat mass removal versus time and a plot of influent ground water <br /> MTBE concentrations versus time are included in Appendix D <br /> The results from the ground water monitoring and sampling events performed in September 2004 <br /> are as follows <br /> Advanced GeoFnv■ronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.