Laserfiche WebLink
10 August 2004 <br /> AGE-NC Project No 96-0232 <br /> Page 4 of 10 , <br /> Each preserved sample was logged on a chain-of-custody form, placed in a chilled container and <br /> transported to a DHS-certified laboratory for analysis for <br /> - Y TPH=g, TPH-d an TPH-mo by EPA Method 5030/8015M and LUFT/EPA Method 8015B,= <br /> • BTEX by EPA Method 8020, <br /> Y 1,2-DCA, EDB, TBA, DIPE, ETBE, TAME and MTBE by EPA Method 8260B, and <br /> O Semi-volatile organic compounds by EPA Method 8270 <br /> 2 5 EQUIPMENT DECONTAMINATION ' <br /> The hollow stem augers and the Geoprobe rods were pressure washed prior to each bore hole <br /> advancement Sampling tools and brass sleeves used for sample collection were thoroughly washed <br /> with a solution of Alconox, and were thoroughly rinsed with clean tap water prior to each sampling <br /> sequence Following drilling activities,nnseate generated from decontaminating the equipment was <br /> placed in properly labeled DOT-approved model 17H 55-gallon drums and was stored on-site in an <br /> iarea lacking public access <br /> 2 6 MONITORING WELL COMPLETION <br /> Soil boring MW-19 was dual-completed as a ground water monitoring well utilizing two separate <br /> sets-of 2-inch diameter, schedule 40,blank polyvinylchloride (PVC)well casing and perforated,2- - <br /> inch' diameter PVC well casing (0 020-inch slot) The deepest section of well casing was first <br /> installed by placing the entire well casing assembly through the hollow stem of the augers to the total <br /> depth of the boring The augers were then incrementally raised as No 3 Lonestar Lapis Luster sand <br /> (filter pack)was slowly poured down the annulus between the well casing and the inner wall of the <br /> hollow stem auger The filter pack was placed adjacent to the screened casing from the bottom of <br /> the boring to a point approximately two feet above the top of the screen, following filter pack <br /> placement, a surge block was inserted into the well casing and was alternately raised and lowered <br /> (surged) repeatedly for approximately 20 minutes Thereafter, '/a-inch diameter coated bentonite <br /> pellets (Pell Plug TR-30) were slowly poured down the annulus to form a transition seal above the <br /> bottom well casing assembly and filter pack, the transition seal was allowed to hydrate for a <br /> minimum of 30-minutes before well construction activities continued Following the 30-minute <br /> hydration period, the uppermost section of well casing was next installed by placing the entire well <br /> casing assembly through the hollow stem of the augers The augers were then incrementally raised <br /> as filter pack material was slowly poured down the annulus between the well casing and the inner <br /> wall of the hollow stem auger The filter pack was placed adjacent to the screened casing from the <br /> Advanced GeoEnvironmental,Inc <br />