Laserfiche WebLink
15 October 2003 <br /> AGE-NC Project No 96-0232 <br /> Page 5 of 5 <br /> 3 2 EQUIPMENT DECONTAMINATION <br /> i <br /> All sampling tools used for sample collection will be thoroughly rinsed with clean water after being <br /> washed with a solution of Alconox All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting the boring <br /> 33 SOIL BORING COMPLETION <br /> Following collection of soil samples,each borehole will be filled to the ground surface with a cement <br /> grout The grout mixture will consist of Type I/II portland neat cement and not more than 6 gallons <br /> of water per 44-pound sack of cement The grout will be deployed through a tremmie pipe If <br /> required, a grouting inspection will be scheduled with SJCEHD personnel <br /> Advanced GeoEnvironmental,Inc <br />