Laserfiche WebLink
' 11 August 2003 <br /> S AGE-NC Project No 96-0232 <br />' Page 6 of 15 <br />' The volume of extracted water between 25 March and 21 April 2003 was equal to 701,055 gallons, <br /> which equates to a mass of 5,844,696 pounds of processed water Multiplying the average MTBE <br /> concentration(assumed to be 66 µg/l based on the average of the March and April 2003 influent grab <br />' water samples) by the pounds of extracted MTBE-impacted ground water yields approximately <br /> 0 39 pounds of MTBE removed from MTBE-impacted ground water during this period <br /> (Appendix D) <br />' The volume of extracted water between 21 Apnl and 14 May 2003 was equal to 245,406 gallons, <br /> which equates to a mass of 2,045,950 pounds of processed water Multiplying the average MTBE <br />' concentration(assumed to be 43 µg/1 based on the average of the April and May 2003 influent grab <br /> water samples) by the pounds of extracted MTBE-impacted ground water yields approximately <br /> 0 09 pounds of MTBE removed from MTBE-impacted ground water during this period <br />' (Appendix D) <br /> The volume of extracted water between 14 May and 25 June 2003 was equal to 1.144,208 gallons, <br />' which equates to a mass of 9,539,262 pounds of processed water Multiplying the average MTBE <br /> concentration(assumed to be 27 µg/1 based on the average of the May and June 2003 influent grab <br /> water samples) by the pounds of extracted MTBE-impacted ground water yields approximately <br />' • 0 26 pounds of MTBE removed from MTBE-impacted ground water during this period <br /> (Appendix D) <br /> fDuring the second quarter 2003, an estimated 0 74 pounds of MTBE was extracted from ground <br /> water,to date,the ground water treatment system has removed a total of approximately 12 16 pounds <br />' of MTBE from extracted ground water (Table 8) Second quarter 2003 mass-volume calculations <br /> of MTBE-impacted ground water extracted from the ground water pump-and-treat system are <br /> presented in Appendix D Plots of cumulative ground waterpump and treat mass removal trends and <br />' influent ground water MTBE concentrations versus time are in Appendix E <br />' 3.0. GROUND WATER MONITORING AND SAMPLING <br /> On 24 through 27 June 2003, ground water monitoring and sampling were performed at 35 ground <br /> water monitoring wells (MW-1 through MW-18) and at ten ground water extraction wells (EW-1 <br /> through EW-10), in addition, grab water samples were collected from two San Joaquin County <br /> service area No 31 municipal water wells (CSA-1 and CSA-2) on 27 June 2003 Quarterly ground <br /> water monitoring procedures for the site were outlined in the AGE-prepared Work Plan Addendum, <br /> dated 28 January 1998,and approved by the San Joaquin County Environmental Health Department <br /> (SJCEHD) by letter dated 24 February 1998 As-built monitoring well construction details are <br /> summarized in Table 9 <br /> Advanced GeoEnvironmentai,Inc <br /> I <br />