My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000679
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000679
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 8:22:33 PM
Creation date
2/15/2019 3:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000679
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Quarters Report - Second Quarter 2003 <br />' FLAG CITY CHEVRON <br /> 6421 Capitol Avenue, Lodi, California <br /> I1.0. INTRODUCTION AND SCOPE OF WORK <br />' At the request of Mr Richard Bokides,Advanced GeoEnvironmental, Inc (AGE)has prepared this <br /> quarterly report for 6421 Capitol Avenue (the site), Lodi, California The report documents <br /> procedures and results for ground water monitoring and remediation performed at the site between <br />' March and June 2003 (second quarter) The site setting is illustrated on Figure 1 Site structures and <br /> monitoring well locations are depicted on Figure 2 <br /> I The enclosed report was prepared as required by California Regional Water Quality Control Board- <br /> Central Valley Region (RWQCB) Cleanup and Abatement Order No 5-00-700, dated 01 March <br /> 2000,and was prepared in accordance with guidelines established by the RWQCB for investigation <br /> of underground storage tank (UST) sites Background information and a description of prior <br /> investigations at the site were included in AGE's Final Remedtatzon Plan, dated 31 August 2000 <br /> The objectives the of second quarter investigations were to characterize, assess and monitor <br /> dissolved petroleum hydrocarbons and methyl tert-butyl ether (MTBE) concentrations in ground <br /> water,to characterize ground water flow direction and gradient and to continue ground water pump- <br /> and-treat remediation at the site The following is a brief summary of second quarter site assessment <br /> and remediation activities performed at the site <br /> 5 June 2 <br /> Between 25 March and 2 <br /> a 003-Continued pump-and-treat rernedlatron utilizing on- <br /> site extraction wells EW-4, EW-5, EW-7, EW-8, discharged a total of approximately <br /> 2,090,669 gallons of treated Flag City Chevron ground water into a conveyance ditch located <br /> approximately 450 feet south of the site <br /> ® 21 April,14 May and 25 June 2003 -Monthly monitoring events at the ground water pump- <br /> and-treat remediation system, extraction wells EW-4, EW-5, EW-7 and EW-8 were in <br /> operation <br /> • 25, 26 &27 June 2003 - Quarterly ground water monitoring event (second quarter 2003) at <br /> wells MW-1 through MW-18, EW-1 through EW-10, CSA-1 and CSA-2 <br />' 2.0 GROUND WATER PUMP AND TREAT REMEDIATION SYSTEM <br /> Between 25 March 2003 and 25 June 2003 (second quarter 2003), a ground water pump-and-treat <br /> remediation system was in continuous operation at the site Groundwater pump-and-treat operation <br /> and maintenance procedures for the site were outlined in AGE's Final Remediation Plan, dated <br /> 31 August 2000 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.