Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> 1 0 INTRODUCTION .. 1 <br /> 20 ON-SITE GROUNDWATER EXTRACTION AND TREATMENT .. 1 <br /> 30 ASSESSMENT OF OFF-SITE MTBE-IMPACTED GROUND WATER 2 <br /> 40 PROPOSED OFF-SITE REMEDIATION . . 2 <br /> 41 OFF-SITE CLEAN-UP GOALS 3 <br /> 42 OFF-SITE SECOND ZONE GROUND WATER EXTRACTION AND TREATMENT 3 <br /> so SCOPE OF WORK 4 <br /> 5 1 PERMITTING, PLANNING AND PRE-FIELD WORK ACTIVITIES 4 <br /> 52 INSTALLATION OF OFF-SITE REMEDIATION WELLS 5 <br /> 5 3 INSTALLATION OF OFF-SITE REMEDIATION PIPING SYSTEM 5 <br /> 54 WELL PUMPS, INSTALLATION AND PROCESS PIPING 5 <br /> 55 EXTRACTION WELL PUMP CONTROLLERS 6 <br /> 56 TREATMENT SYSTEM 6 <br /> 57 MONITORING AND MAINTENANCE ACTIVITIES 6 <br /> 60 PROCEDURES 7 <br /> 61 DRILLING ACTIVITIES 7 <br /> 62 OFF-SITE SYSTEM DESIGN 7 <br /> • 6 2 1 Off-Site Ground Water Extraction Well Installation 8 <br /> 622 Off-Site Ground Water Extraction Piping System 8 <br /> 6 2 3 Off-Site Ground Water Extraction Monitoring Activities 9 <br /> 63 PROCESS AND CONFIRMATION SAMPLING 9 <br /> 70 EQUIPMENT AND OPERATIONAL SAFETY .. .. 9 <br /> Advanced GeoEnvironmental,Inc <br />