Laserfiche WebLink
Quarterly Report - First Quarter 2001 <br />' FLAG CITY CHEVRON <br /> 6421 Capitol Avenue, Lodi, California <br /> I1.0. INTRODUCTION AND SCOPE OF WORK <br />' At the request of Mr Richard Bokides,Advanced GeoEnvironmental, Inc (AGE)has prepared this <br /> quarterly report for 6421 Capitol Avenue (the site), Lodi, California The report documents <br /> procedures and results for remediation and subsurface investigations conducted at the site during <br />' January, February and March 2001 (first quarter 2001) The enclosed quarterly report was prepared <br /> as required by California Regional Water Quality Control Board- Central Valley Region (RWQCB) <br /> Cleanup and Abatement Order No 5-00-700, dated 01 March 2000 The site setting is illustrated on <br />' Figure 1 Site structures and monitoring well locations are depicted on Figure 2 <br />' The objectives of first quarter investigations were to characterize, assess and monitor dissolved <br /> petroleum hydrocarbons and methyl tert butyl ether (MTBE) concentrations in ground water, to <br /> charactenze ground water flow direction and gradient and to continue ground water remediation at <br />' the site This report is prepared in accordance with guidelines established by the California Regional <br /> Water Quality Control Board(CRWQCB)-Central Valley Division for investigation of underground <br /> storage tank(UST)sites Background information and a description of prior investigations at the site <br /> lie were included in AGE's Final Remediation Plan, dated 05 October 2000 <br /> The following is a brief summary of first quarter 2001 site assessment and remediation activities <br /> performed at the site <br /> C 01 January through 31 March 2001 - Continued"pump and treat"remediation utilizing wells <br /> EW-2, EW-4, EW-5, EW-6, EW-7, EW-8, EW--9 and EW-10, <br /> • 01 January through 31 March 2001 -Discharge approximately 2,474,726-gallons of extracted <br /> Iand treated water into Coldani Ditch <br /> • 08 and 09 March 2001 - First Quarter 2001 ground water momtonng event <br /> • 14 March 2001 - Expose well MW-10 which was paved over during street construction <br /> activities,perform ground water monitoring and sampling at MW-1 OA,MW-IOB,MW-1 OC, <br /> MW-IOD and MW-IOE <br /> r <br /> 2.0 GROUND WATER PUMP AND TREAT REMEDIATION SYSTEM <br /> Between 01 January and 31 March 2001, a ground water pump and treat system was continuously <br /> I operated at the site, ground water pump and treat operation and maintenance procedures for the site <br /> were outlined m Final Remediaion Plan, dated 31 August 2000,prepared by AGE and approved by <br /> the RWQCB by letter dated 05 October 2000 <br /> Advanced CeoEnvironmental,Inc. <br />