My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000685
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:09:31 PM
Creation date
2/15/2019 4:02:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000685
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 09 May 2002 <br /> AGE-NC Project No 96-0232 <br /> Page 3 of 8 <br /> 2 2 SOIL BORING AND WELL PLACEMENT <br /> AGE proposes Installation of wells and soil bonng placement In the following areas <br /> • One 2-inch diameter ground water monitoring/extraction well (MW-14) located between 5 <br /> and 15 feet southeast of monitoring well MW-7 and screened between 40 and 60 feet bsg, <br /> • One 2-mch diameter ground water monitonng/extraction well (MW-15) located between 5 <br /> and 15 feet southeast of monitoring well MW-7 and screened between 65 and 75 feet bsg, <br /> • One 2-mch diameter ground water monitoring/extraction well (MW-16) located between 60 <br /> and 70 feet west of monitoring well MW-7 and screened between 5 and 25 feet bsg, <br /> • One 2-Inch diameter ground water monitoring/extraction well (MW-17) located between 60 <br /> and 70 feet west of monitoring well MW-7 and screened between 40 and 60 feet bsg, <br /> • One 2-inch diameter ground water monitoring/extraction well (MW-18) located between 60 <br /> and 70 feet west of monitoring well MW-7 and screened between 65 and 75 feet bsg, <br /> • One triple completed, 2-inch diameter ozone sparge well (OSW-1) located between 5 and <br /> 15 feet northwest of MW-l 1 and screened between 30 and 32 feet bsg, 50 and 52 feet bsg <br /> and 70 to 72 feet bsg, <br /> • One soil boring (P-36) located between 15 and 25 feet southeast of well MW-8, <br /> • One soil boring (P-37) located between 15 and 25 feet southwest of well MW-8, <br /> • One soil boring (P-38) located between 20 and 30 feet north of well MW-8, <br /> Proposed well locations are depleted in Figure 2, proposed soil boring locations are depicted in <br /> Figure 3, general lithology and the estimated extent of petroleum-impact to soil beneath the site is <br /> depicted in cross sectional views C-C'm Figure 4 Procedures for well installation are presented in <br /> Section 3 2 <br /> Following well installation, each water well will be developed to maximize water flow into the well <br /> and minimize the amount of fine-grained sediment drawn into the well during pumping or bailing <br /> Procedures for well installation and development are presented in Sections 3 2 and 3 3, respectively <br /> 23 SECOND ZONE GROUND WATER AQUIFER PUMPING TEST <br /> Following installation of MW-14, a 24-hour aquifer pumping test will be performed in the Second <br /> . Water Zone at the site to evaluate a general radius of influence and capture zone during ground water <br /> extraction The proposed aquifer pumping test will be designed to obtain general aquifer <br /> Advanced GeoEnvironmentsl,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.