Laserfiche WebLink
0 <br /> 09 May 2002 <br /> AGE-NC Project No 96-0232 <br /> Page 3 of 8 <br /> 2 2 SOIL BORING AND WELL PLACEMENT <br /> AGE proposes Installation of wells and soil bonng placement In the following areas <br /> • One 2-inch diameter ground water monitoring/extraction well (MW-14) located between 5 <br /> and 15 feet southeast of monitoring well MW-7 and screened between 40 and 60 feet bsg, <br /> • One 2-mch diameter ground water monitonng/extraction well (MW-15) located between 5 <br /> and 15 feet southeast of monitoring well MW-7 and screened between 65 and 75 feet bsg, <br /> • One 2-mch diameter ground water monitoring/extraction well (MW-16) located between 60 <br /> and 70 feet west of monitoring well MW-7 and screened between 5 and 25 feet bsg, <br /> • One 2-Inch diameter ground water monitoring/extraction well (MW-17) located between 60 <br /> and 70 feet west of monitoring well MW-7 and screened between 40 and 60 feet bsg, <br /> • One 2-inch diameter ground water monitoring/extraction well (MW-18) located between 60 <br /> and 70 feet west of monitoring well MW-7 and screened between 65 and 75 feet bsg, <br /> • One triple completed, 2-inch diameter ozone sparge well (OSW-1) located between 5 and <br /> 15 feet northwest of MW-l 1 and screened between 30 and 32 feet bsg, 50 and 52 feet bsg <br /> and 70 to 72 feet bsg, <br /> • One soil boring (P-36) located between 15 and 25 feet southeast of well MW-8, <br /> • One soil boring (P-37) located between 15 and 25 feet southwest of well MW-8, <br /> • One soil boring (P-38) located between 20 and 30 feet north of well MW-8, <br /> Proposed well locations are depleted in Figure 2, proposed soil boring locations are depicted in <br /> Figure 3, general lithology and the estimated extent of petroleum-impact to soil beneath the site is <br /> depicted in cross sectional views C-C'm Figure 4 Procedures for well installation are presented in <br /> Section 3 2 <br /> Following well installation, each water well will be developed to maximize water flow into the well <br /> and minimize the amount of fine-grained sediment drawn into the well during pumping or bailing <br /> Procedures for well installation and development are presented in Sections 3 2 and 3 3, respectively <br /> 23 SECOND ZONE GROUND WATER AQUIFER PUMPING TEST <br /> Following installation of MW-14, a 24-hour aquifer pumping test will be performed in the Second <br /> . Water Zone at the site to evaluate a general radius of influence and capture zone during ground water <br /> extraction The proposed aquifer pumping test will be designed to obtain general aquifer <br /> Advanced GeoEnvironmentsl,Inc <br />