My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000688
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:15:18 PM
Creation date
2/15/2019 4:07:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000688
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> GeoEnvironmental, Inc . <br /> 0 <br /> 11 July 2000 - - <br /> AGE-NC Project No 96-0232 <br /> W <br /> Mr Many Hartzell iceZ3 M~ " <br /> Regional Water Quality Control Board - Central Valley Region sem, <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827 <br /> Subject- Remedial Investigation/Feasibility Study Work Plan Addendum <br /> FLAG CITY CHEVRON <br /> 6421 Capitol Avenue, Lodi, California <br /> Dear Mr Hartzell <br /> At the request of Mr Richard Bokides of Flag City Chevron, Advanced GeoEnvironmental, Inc <br /> • (AGE)has prepared this work plan addendum to the Remedial Investigation/Feasibility Study Work <br /> Plan (dated 24 September 1999) for installation of two ground water observation wells and <br /> performance of a constant rate ground water aquifer pump test at 6421 Capital Avenue, Lodi, <br /> California It is AGE's plan to install the observation wells in a manner that there is the option of <br /> converting the observation wells to ground water extraction wells at a later date The work proposed <br /> in this work plan addendum is necessary to prepare the Final Remediaton Plan as required by Central <br /> Valley Regional Water Quality Control Board (RWQCB) Cleanup and Abatement 01 der No 5-00- <br /> 700, dated 01 March 2000 <br /> Upon regulatory approval of this work plan addendum, all necessary permits and permit fees will <br /> be submitted to the San Joaquin County Public Health Services - Environmental Health Division <br /> If you have any questions or comments, please contact the undersigned at (209) 467-1006 <br /> Sincerely, <br /> Advanced GeoEnviron mental, Inc. <br /> lv;JA,4 . <br /> Timothy 0 CVellar <br /> Project Geologist <br /> Enclosures <br /> 4005) North NN ikon W n titmklun C tit IOjm + 95200 <br /> TLlcphmmc (209) .167-1006 1 AX (2_09) 407-11 18 <br /> �C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.