Laserfiche WebLink
19 July 2000 <br /> AGE-NC Project No 96-0232 <br /> Page 29 of 29 <br /> Reduction of monthly ground water monitoring and sampling from wells MW-1 through <br /> MW-13 to quarterly monitoring events <br /> • Continued monthly ground water monitoring and sampling of municipal water wells CSA-1 <br /> and CSA-2 and domestic water wells DW-1 and RDW-1 <br /> • Installation of fuel-dispenser containment pans beneath each fuel dispenser at the Flag City <br /> Chevron site <br /> • Continued ground water extraction from EW-1 (interim remediation measures)to control and <br /> reduce MTBE- impact in groundwater <br /> 14 0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon field <br /> measurements and analytical results provided by an independent laboratory Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> limited number of available data points (t e cone penetrometer testing, soil samples and ground <br /> water samples) and subsurface conditions may vary away from these data points No other warranty, <br /> expressed or implied, is made as to the professional recommendations contained in this report <br /> • <br /> Advanced GeoEmiron mental,Inc <br />• <br />