My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000690
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:42:20 PM
Creation date
2/15/2019 4:10:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000690
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ v JJ <br /> TABLE 11 <br /> Soil and Ground Water Corrective Action Alternatives <br /> FLAG CITY CHEVRON <br /> 6421 Capitol Avenue,Lodi,CaIifonma g <br /> * -t����'�d 32� <br /> a r+ <br /> r,-Method Advantages , <br /> v Disadvantages ` `"° g , Typical'MonitonngQ Esti ted Duration <br /> g ,Monitonn and i> <br /> r ° Requiremcnts u <br /> Maintenance <br /> In-situ Air Combines well with SVE•Readily •initial equipment/design costs can be costly $5,000 to$10,000 Monthly groundwater unknown <br /> parging available equipment•Little •air flow channeling-Effectiveness decreases annually,$34,000 to depth measurements, <br /> equipment maintenance required with less permeable material $45,000 start-up cost monthly sample <br /> Seclion 9 1 collection <br /> Pump and Treat •Rapid reduction in high •High volumes of extracted water will $208,000 to 416,000 Quarterly or monthly 24 to 36 months <br /> concentrations•Prevent spreading of require disposal •Typically unable to achieve on-site total cost,off- monitoring,analysis of <br /> Section 9 2 plume cleanup goals•Equipment can be costly site cost could exceed extracted water <br /> $2,820,200 <br /> In-situ •Relatively simple design and •Usually no immediate reduction in $25,000 to Monthly ground water unknown <br /> ioremediation application process•Little or no hydrocarbon concentrations•Remediation $40,000 total cost and vapor sampling, <br /> Ground Water) maintenance required controls difficult to implement•Regulatory annually,start up quarterly monitoring, <br /> acceptance difficult to obtain•Waste between$45,000 and microbiological <br /> Section 9 3 discharge permits sometimes required• $75,000 analysis of samples <br /> MTBE biodegrades slowly <br /> Natural •Lower costs than most active •Not effective for higher contaminant $6,000 to$20,000 Quarterly ground water unknown <br /> Attenuation remedial alternatives•Minimal concentrations•Migration of contamination annually monitoring <br /> disturbance to the site•Potential use may occur•Longer time frame than active <br /> eclion 9 4 below structures remediation•May not achieve cleanup levels <br /> within reasonable length of time•Not <br /> generally permitted when free product is <br /> resent,MTBE biodegrades slowly <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.