My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000690
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:42:20 PM
Creation date
2/15/2019 4:10:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000690
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, I <br /> l <br />.l` <br /> TABLE OF CONTENTS (Continued) <br /> LIST OF FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 -Site Map <br /> Figure 3 -Site Map <br /> Figure 4 -Site Plan UST Removal Sample Locations <br /> Figure 5 - Ground Water Monitoring Well Construction Diagram MW-4 <br /> Figure 6 -Relative Ground Water Elevation July 1996 <br /> Figure 7-Relative Ground Water Elevation August 1996 <br /> Figure 8 -Relative Ground Water Elevation May 1997 <br /> Figure 9 - Geologic Cross Section A -A' <br /> Figure 10 - Geologic Cross Section B -B' <br /> Figure 11 -Relative Ground Water Elevation February 1998 <br /> Figure 12 - Ground Water Monitoring Well Construction Diagram MW-5 <br /> Figure 13 - Ground Water Monitoring Well Construction Diagram MW-6 <br /> Figure 14 - Ground Water Monitoring Well Construction Diagram MW-7 <br /> Figure 15 - Ground Water Elevation Contour Map July 1998 <br /> Figure 16 - Ground Water Elevation Contour Map November 1998 <br /> Figure 17 - Ground Water Elevation Contour Map February 1999 <br /> Figure 18 - Ground Water Elevation Contour Map June 1999 <br /> Figure 19 - Ground Water Elevation Contour Map February 2000 <br /> Figure 20 - Ground Water Extraction Well Construction Design EW-1 <br /> Figure 21 - Geologic Cross Section C- C' <br /> Figure 22 - Geologic Cross Section D-D' <br /> Figure 23 - Geologic Cross Section E-E' <br /> Figure 24 - Gi ound Water Elevation Contour Map March 2000 <br /> Figure 25 -Appn oximate Extent of Shallow Ground Water TPH-d <br /> Figure 26 -Approximate Extent of Shallow Ground Water TPH-g <br /> Figure 27 -Approximate Extent of Shallow Ground Water MTBE <br /> Figure 28 - Ground Water Elevation Contour Map April 2000 <br /> Figure 29 -Multi-Level Monitoring Well Design MW-8 <br /> Figure 30 -Multi-Level Monitoring Well Design MW-9 <br /> Figure 31 -Multi-Level Monitoring Well Design MW-10 <br /> Figure 32 -Multi-Level Monitoring Well Design MW-11 <br /> Figure 33 -Multi-Level Monitoring Well Design MW-12 <br /> Figure 34 -Multi-Level Monitoring Well Design MW-13 <br /> Figure 35 - Ground Water Elevation Contour Map May 2000 <br /> Figure 36 -Estimated Extent of Dissolved MTBE(Screened 5 to 30 Feet) <br /> Figure 37 -Estimated Extent of Dissolved MTBE(Screened 40 to 75 Feet) <br /> Figure 38 -Estimated Extent of Dissolved TPH-g(Screened 5 to 30 Feet) <br /> Figure 39 -Estimated Extent of Dissolved TPH-d(Sb eened 5 to 30 Feet) <br /> Figure 40 -Estimated Extent of Dissolved TPH-d(Screened 5 to 30 Feet) <br /> Figure 41 -Estimated Distribution of"Adsorbed"MTBE <br /> Advanced GeoEmironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.