Laserfiche WebLink
03/22/2OeO 17 36 2893671118 AGE STOCKTOH PAGE 13 <br /> 08 March 2000 <br /> . AGE NC Prod ect No 95-0232 <br /> Page 9 of 11 <br /> N apox using a photo-ionization detector (PID Thermo EnNuonrnental 580A, 10 0 eV, cahbrated to <br /> isobutylene)and recorded on boring logs Soil sample duplicates will be described using the Unified <br /> Soil Classification System (USCS) and recorded on the boring logs <br /> Proposed soil boring locations are illustrated on Figure 2 Following borehole advancement,pordand <br /> cement(grout mix)will be utilized to backfill each borehole utilizing a tremie pipe The PIIS-EHD <br /> and the RWQCB will be given the opportunity to inspect the grout mix prior to backfilling activities <br /> d 2 GROUND WATER MONITORING WELL PILOT BORINGS <br /> Pilot soil borings will be advanced utilizing a truck-mounted, hollow--sterni drill ng and 8-inch <br /> diameter hollow-stein augers Cuttings generated during drilling activities will be placed on plastic <br /> sheeting and covered Rinseate will be containerized in properly labeled DOT-approved 55-gallon <br /> drums, and stored on-site in an area lacking public access Disposal alternatives mall be evaluated <br /> based on results of soil and water analysis <br /> • 4 3 GROUND WATER MONITORING WELL COMPLETION <br /> Each group of"clustered"pilot bonngs will be single-completed as ground water monitoring wells <br /> utilizing 2-inch diameter schedule 40 polyvin,ylchlonde(PVC) 0 010-inch slotted well screen acid <br /> blank well casing A 10-foot length of well screen is anticipated for installation of each"clustered" <br /> ground water monitonrig do ell, however,based on geologic/hydrogeologic data collected from CPT <br /> soil borings,the well screen lengths may vary A proposed well construction diagram is depicted in <br /> Figure 3 <br /> After installing the well casing in each pilot boring, a filter pack material consisting <br /> sand will be added through the augers over the screen interval to approximately of pre-washed <br /> #212 Lonestar proximately two <br /> feet above the screened interval Following placement of the filter pack, the well u ill be surged to <br /> assist in settling the filter pack Additional sand will be added if settling occurs <br /> A.nominal two-foot bentonite seal(pell plug-coded bentonite pellets)will be placed above the filter <br /> pack to minimize the potential for grout penetration into the screened section of the well The <br /> bentonite seal will be formed by pouring bentonite pellets into the annulus and allowing there to <br /> settle on the filter pack The bentonite pellets will be allowed to hydrate for a minimum of one-half <br /> hour prior to grouting <br /> The remaining annular space will be filled to the ground surface with a cement grout The grout <br /> mixture will consist of Type UII portlaud neat cement and not more than 6 gallons of water per 34- <br /> Advanced Co0En%1T0nmeetA1 lie <br />