My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000697
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 7:15:49 PM
Creation date
2/15/2019 4:15:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000697
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced BORING LOG <br /> GeoEnviron <br /> mental, Inc. BOREHOLE NO EW-2 <br /> 837 Shaw Road, Stockton, CA 95215 <br /> (209)467-1006 FAX (209) 467-1118 TOTAL DEPTH 351 <br /> Project FLAG CITY CHEVRON Drilling Co WEST HAZ MAT DRILLING <br /> Site Location 6421 CAPITOL AVENUE Rig/Auger Type B-85/10 25-INCH H S <br /> LODI <br /> CALIFORNIA Logged By T CUELLAR <br /> Project No AGE-NC-96-0232 Reviewed By N HENDERSON <br /> Date(s) Drilled 07/17/00 <br /> Notes Total depth ofbormg EW-2 equal to 35 feet bsg,boring a Water level during drilling <br /> completed as 4-inch diameter ground water extraction well !c Water level in completed well Page 1 of 1 <br /> Depth Sample Blows PID Soil USCS Class and Well Well <br /> lD ft (ppm) Symbol Sod Description Completion Description <br /> 0 <br /> Well cover,water- <br /> 1 PIA, <br /> tight,locking cap <br /> —5 Nq 50i1 SAM�ts COf (.Tco <br /> Cement grout seal from 1' <br /> to 6'bsg <br /> Bentonite seal from 6'to <br /> —10 8' bsg <br /> —1 <br /> #3 sand from 8'to 35'bsg <br /> —20 <br /> Screened interval from lo' <br /> to 35'bsg <br /> -25 <br /> -30- <br /> -35— <br /> Well <br /> 30-35 Well plug at 35' <br />
The URL can be used to link to this page
Your browser does not support the video tag.