Laserfiche WebLink
Mr Richard Bokides - 3 - 6 November 2000 <br /> Mr Nick Dingsa <br /> • <br /> GENERAL INFORMATION AND REQUIREMENTS <br /> General Order No 5-00-119 (enclosed) prescribes mandatory discharge monitoring requirements for <br /> compliance with the General Order The project activities shall be operated in accordance with the <br /> requirements contained in the General Order and with the information submitted in the application <br /> packet <br /> As required within Attachment B (Monitoring and Reporting Program, MRP) of enclosed General Order <br /> 5-00-119, the upstream and downstream receiving water location(R-1 and R-2, respectively) shall be <br /> approved by Board staff The present proposed receiving water locations are 50 feet up and 50 feet <br /> downstream of the point of discharge into Coldam Ditch Within 5 working days of receipt of this <br /> NOA, the Discharger or appropriate representative shall schedule with Board staff to conduct a site <br /> inspection and establish appropriate receiving water sample locations. <br /> The MRP sets forth mandatory monitoring requirements, however, additional monitoring has been <br /> deemed necessary by staff The Regional Board requires that the effluent and receiving water be <br /> monitored for nitrates on a monthly basis Nitrate results shall be included in the required self- <br /> monitoring <br /> elfmonitoring reports as specified in the MRP <br /> Regional Board staff has been notified of the time schedule to implement the project Additionally, the <br /> Regional Board shall be notified immediately if any nuisance or detriment to the receiving waters is <br /> observed during the implementation of the project Failure to abide by the conditions of the General <br /> Order could result in an enforcement action as authorized by provisions of the California Water Code <br /> The required annual fee (as specified in the annual billing you will receive from the State Water <br /> Resources Control Board) shall be submitted until this Notice of Applicability is officially terminated <br /> Please notify this office in writing when the project has been completed and the discharge is no longer <br /> necessary, so we may terminate applicability of this general order <br /> If you have any questions or comments regarding this notification, please contact Mr Marty Hartzell <br /> (916) 255-3115 or Robert Fagerness (916) 255-3022 of my staff <br /> GARY M CARLTON <br /> Executive Officer <br /> GMC rsf <br /> Enclosures General Order No 5-00-119 <br /> Standard Provisions <br /> CC List attached <br />