My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000703
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 10:02:47 PM
Creation date
2/15/2019 4:23:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000703
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. Quarterly Report--.September 1997 <br /> FLAG'CITY CHEVRON <br /> 6421•Capital Avenue <br /> Lodi,:California i <br /> -1.0: ' 'INTRODUCTION AND SCOPE,OF WORK <br />' In accordance 'with 'a re uest from Mr. Richard.�Bokides -of Fla City' . Advanced <br /> q g Y , <br /> GeoEnvironmental,'Inc: (AGE) has.prepared this Quarterly Report for 6421'Capital'Avenue, Lodi;. <br /> California. The location of the site is illustrated in Figure I Location Map:'A plan'of the•site is- <br />' illustrated in <br /> Figure 'Site <br /> ' gure 2 - <br /> Plai1. <br /> The sco.pe'.ofwork included.the advancement offive'soil-borings on and offsite with the'obje'ctive to ' <br /> assess,and delineate methyl tertiary,butyl ether ( ln"both soil"and ground'water: This report .. <br /> t' is prepared' i' accordance with guidelines established b the'.San Joaquin?CourityTPublic' Health -* <br /> Services -Environthental Health Division (PHS-EHD) and the Central Valley'Regional Water Quality <br />' Control Board'for-inv i ' <br /> est gation•of underground storage.tank{UST)-saes. <br /> Backgrou' rid information and.a description-of prior investigations:at the site was included in the <br /> Closure Siminiary,Report -April .1996,'dated,28 April,1997^prepared by.AGE: <br /> 2.0. PROCEDURES, , <br /> 2.1_ SCOPE OF WORK <br /> The scope of work-for this investigation included advancement:the'of five"soil borings,collection,of <br /> I ,+ soil andround water sam lesflbot <br /> ' or aato nal sis and' re aration f hi" r <br /> g P . n' aY P P o f s rep A. <br /> 2,2:. ADVANCEMENT OE SOIILBORINGS' <br /> On 19 August and 22 September 1997, a van-mounted Geoprobe 5400 equipped-with 1.1257inch <br /> diarneter probe rods'was utilized"to advance three soil probe borings-(P-1, P-2 and-P=5) to maximum <br /> depths of.60"feet below site grade (bsg), both on and offsite:'; <br /> On 29.August and 45, September.1997, a truck-mounted drill rig and 8-inch diameter hollow.stem <br /> augers,was utilized to advance'two.soil boring5,(P-3,and P-4) onsit6,to maximum depths.of 70 feet <br /> • bsg. A]1 cuttings and:rinseate generated -during,=driIling activities=were containerized in properly, <br /> labeled D:O.T. model•1-7H,55-gallon drums-and stored onsite in an area NIIacking access to the general <br /> public. • ' - - � _ ` . . . . • <br /> A' <br /> Advanced GcoEitivironmental;Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.