Laserfiche WebLink
• DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> Rf ICT NAIL S O Cl vl tXNAMS##I�. xws'PERI=CfRIIIIf�W Tt'ki�a�;� <br /> Pc€I Plat <br /> Lam# A AI COIAIIWIER }i.2 A' .. ::. . .....:...... <br /> :... ....: :0AI..YSIS Ein .A11~•SH t t 30 LABS <br /> CLIENT: DILLON & MURPHY DATE: 10/07/93 <br /> PROJECT MANAGER: CECIL DILLON SAMPLE LOCATION: MW-3 <br /> AMPLER: DON LIGHT TART TIME: 10.40 <br /> i <br /> ROUNDWATER: XXX ADOSE: THER: <br /> ASING ELEVATION: (FEET MSL) ASING DIAMETER: 2 INCH <br /> EPTH TO WATER: 11.04 FEET ALCULATED PURGE VOLUME: 2.01 GAL, <br /> I <br /> EPTH OF WELL: 23.36 FEET CTUAL VOLUME PER PURGE: 2.00 GAL. <br /> IIII1 , OLE <br /> LQt t 'CHER <br /> • ..: ..... ' .>: ,:..:..gal[s��s...... ' .....: ���ts::.. ..�� �.::. �a �.� ISS <br /> 0 7.3 1371 21.2 LT. TURBID NO ODOR <br /> 2 7.0 1341 21.2 11 " <br /> 4 7.1 1350 21.3 CLEAR " <br /> 6 7.1 1352 21.3 " <br /> 8 7.1 1350 21.3 " <br /> PURGE METHOD : ISCO PERISTALTIC PUMP <br /> SAMPLE METHOD: STAINLESS STEEL BAILER (3A) & DISPOSABLE BAILER (36) <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: <br /> WEATHER: CLEAR SKIES <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH DISTILLED WATER & ALCONOX. <br /> CLEAN NITRILE GLOVES WERE WORN AT ALL TIMES. j <br /> WELL LOCATION: ON THE NORTHWEST SIDE OF PUMPING ISLANDS. <br /> CONTAINMENT: D.O.T. 17 DRUM. <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 & 7.0) <br /> ORION CONDUCTIVITY METER <br />. ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />